Commissioning
© Festo Didactic 696688
89
6.7.4 Mitsubishi/MELSEC controllers
•
Controller: Mitsubishi FX1N
•
Programming software: GX IEC Developer 6.01 or higher
1. Connect PC and controller using the RS232/RS422-programming cable with PC-
adapter
2. Switch on the power pack
3. Release the EMERGENCY-STOP (if available)
4. Reset the PLC memory:
–
Wait until the PLC has completed its test routines.
CPU FX1N
–
Set the selector switch to the STOP position.
–
Start the programming software.
–
In the
Online
menu select
PLC Clear
All
and confirm with
YES
.
–
The memory of the PLC is reset and ready for the program to be downloaded.
5. De-archive the project file
03Re.pcd
in the directory Sources\PLC\FX1N of the CD-
ROM provided. (screen shot shows an example)
Under
Extras
Project Restore
…
select project file (CD ROM: Sources\PLC\FX1N),select target directory
03Re.pcd
Open
OK
confirm subsequent message (“After saving,…”)with
OK
6. Compile the project