Festo DADE-MVC 1503b English
22
5.2 Commissioning after Power on/off
If the power supply is switched off, the reference point will
be lost.
Carry out steps 1 ... 4 again.
If referencing is successful, a 1-signal will appear
directly at the Ready output with step 4.
5.3 Overview
LED
INPUT
OUTPUT
S1
S2
Ref
Cal
Ref
Rdy
First commissioning
24 V applied
flashes grn.
red
0
0
0
0
Referencing start
green
red
1
0
0
0
Referencing end
green
yellow
0
0
1
0
Calibration start
green
off
0
1
1
0
Calibration end
green
off
0
0
1
1
Commissioning the calibrated system
24 V applied
flashes grn.
off
0
0
0
0
Referencing start
green
off
1
0
0
0
Referencing end
green
off
0
0
1
1