Supplied By www.heating spares.co Tel. 0161 620 6677
18
Tempra 12 / 18
Fig. 11m
3.
Gently pull back until wall
seal is fl ush with the wall.
Fig. 11l
2.
Push through the outer fl ue.
Fig. 11i
1.
Core drill 127mm hole (5").
Fig. 11n
4.
Place wall plate on outer
fl ue ensuring it is level. Mark
and drill four holes, two top,
for expanding bolts and two
bottom for plugs and screws.
Fix plate to wall with the
square gasket between the
wall and the plate use the
large diameter washers for the
bolts and screws.
Square Gasket
Circular Gasket
Fig. 11o
5.
Through plate into air tube,
drill two holes and fi x in place
using two self tapping screws
M4 x 6mm long.
6.
Cut the outer fl ue fl ush with
the flange on the hanging
plate.
Fig. 1p
7.
Insert the aluminium fl ue
pipe into white plastic
outer fl ue, making sure
the aluminium pipe sits
fully and centrally into the
flue terminal. Mark the
aluminium flue pipe at
the point it is fl ush with
the mounting plate. Add
36mm to this mark and cut
the aluminium inner fl ue
pipe at this point.
Fig. 11g
35 mm