12
ECONCEPT 100
Connection side
1
2
3
1
2
3
4
1
2
3
1
2
3
4
Seals
Flanges with
joining section
Blind flanges
Blind flanges
Flanges with
joining section
Connection side
Fig. 5
Fig. 6a
Plumbing connection using one generator with a water trap
Plumbing connection using two or more generators with a water trap
Key
1
- Gas inlet
2
- System delivery
3
- System return
4
- Condensate drain
Connection instructions
Econcept 100 is equipped on the inside with 3 manifolds (gas, system delivery and return) and a condensate
drain pipe that facilitate cascade connections and also connection of the single module to the system. The
manifolds are sized for connecting up to 5 modules in series. The cabinet contains a set of flanges, seals
and screws for the connection.
To connect a single module (fig. 5)
• After establishing which side of the Econcept 100 module to make the water and gas connections, con-
nect the flanges with the joining section, contained in the kit, on that side after appropriately welding
them onto the system pipes so they are airtight. Make sure to correctly fit the special seals contained in
the kit.
• Connect a pipe Ø40 to the condensate drain pipe to evacuate the condensate produced during opera-
tion (see fig. 7).
• Fit the blind flanges contained in the kit on the opposite side of the module, interposing the special
seals.
To connect several modules in cascade (fig. 6a).
• Connect the first module to the system and gas pipes, as described above, but without fitting the blind
flanges on the opposite side of the module to that of the connection.
• Place the second module on that side, making sure to align the connection flanges and the condensate
drain pipe. Place the seals contained in the kit between the flanges of the two modules.
• Fit the bolts contained in the kit on the flanges from inside the first module, making them come out of the
flanges in the second module. Partially tighten the nuts on the bolts from inside the second module.
• Before tightening the nuts, make sure all the seals are correctly positioned and couple together the
condensate drain pipes of the two modules (see fig. 8).
• Tighten the nuts and repeat the connection operations for the next modules (max.5)
If using a water trap
• Fit the blind flanges on the last module, interposing the special seals.
If using a direct pump
• Connect the delivery to the return on the last module (see fig. 6b).