3.3 Plumbing connections
Important

The heating capacity of the unit must be previously established by calculating the build-
ing's heat requirement according to the current regulations. To ensure proper operation
and long boiler life, the plumbing system must be adequately sized and complete with all
the necessary accessories, including a room thermostat, a thermostattable valve (TRV)
etc. The system delivery and return pipes must have a diameter of at least 22 mm for the
first 3 m of length from the unit.
If the system delivery and return pipes follow a path where air pockets can form in certain
places, it is advisable to install vent valves at these points. Also, type "A" drain cocks
must be installed at the lowest points in the system to allow complete emptying.

B

An automatic bypass with flow rate of at least 6 l/min. must be installed (con-
nected as far away as possible from the boiler) if radiators with thermostatic
valves have been connected.

fig. 7 - Automatic bypass connection

The temperature drop between the delivery manifold and the return to the boiler should
not exceed 20°C.

B

Do not use the water system pipes to earth electrical appliances.

Before installation, carefully wash all the pipes of the heating system to remove any re-
siduals or impurities that could affect proper operation of the unit (as required by BS 7593
Building regs Doc L).
Carry out the connections to the unit as indicated in fig. 8.

fig. 8 - Plumbing connections

Shutoff valve kit

Make sure to install the shutoff valves (supplied) between the boiler and the heating sys-
tem, allowing the boiler to be isolated from the system if necessary.

B

The safety valve outlet must be connected to a copper pipe of 15 mm diameter
with continuous fall from the boiler to run off the system water in case of over-
pressure in the heating circuit. Otherwise, if the discharge valve cuts in and
floods the room, the boiler manufacturer cannot be held liable. The drain must
be run to the outside of the building to avoid the risk of damage or injury due to
the hot water in case of overpressure in the system.

Make the boiler connection in such a way that its internal pipes are free of stress. If a
non-return valve is installed also on the DHW circuit (if provided for), it is necessary to
install a safety valve between the boiler and the circuit (with the non-return valve at least
3 m from the boiler) or an expansion tank for domestic use.
For installation, follow the instructions contained in the kit.

Replenishing water

It is necessary to provide for replenishing of the water lost by the sealed system. Refer
to 

standard BS6798

 for the methods of filling and replenishing water in sealed systems.

There must not be a direct connection between the central heating system of the boiler
and the water mains. For the use of water coming from the water mains and direct pres-
surisation of the system, refer to the local water management by-laws. This connection
must be interrupted after use.
The boiler comes standard with the connection (filling loop) shown in fig. 9. For installa-
tion, follow the instructions given on the instruction sheet enclosed with the kit
To replenish the water in the system:

Fix the removable 

connection “1”

 between the two valves.

Open the two cocks 

“2 and 3”

 until the pressure read on the water gauge is approx.

1 bar.

Close the two cocks 

“2 and 3”

.

At the end of the operation, remove the removable connection 

“1”

.

Reference is made to the provisions contained in the water management by-laws.

fig. 9 - Filling loop

Water treatment

If water treatment is necessary, Ferroli recommends the exclusive use of specific prod-
ucts such as Fernox or Sentinel to be applied according to the producer's instructions.
For further information, please contact:

A

If the boiler is installed in an existing system, any unsuitable additives must be
removed by thoroughly cleaning the system. Cleaning of all the systems must
be done in compliance with the requirements of standard B.S. 7593.

A

In areas with hard water, treatment may be necessary in order to prevent scale
from forming in the boiler.

A

Make sure to use the water treatment product in the right concentration, accord-
ing to the producer's instructions.

3.4 Gas connection

The gas must be connected to the relevant union (see figure on cover) in conformity with
the current regulations, with a rigid metal pipe or with a continuous surface flexible s/steel
tube, installing a gas cock between the system and boiler. Make sure all the gas connec-
tions are tight.

Gas

Hot water

Additional expansion 
vessel C.H. (if required)

Filling
point C.H.

Automatic
Bypass

Cold water mains

36 60 60

89

95

60

204

158

1

3

6

5

2

4

Fernox Manufacturing Co. LTD.

Cookson Electronics, Forsyth Road
Sheerwater, Woking, Surrey, GU21 5RZ
Tel.: 0870 8700362

Sentinel Performance Solutions Ltd

The Heath Business & Technical Park
Runcorn, Cheshire WA7 4QX
Tel.: 0151 424 5351

Содержание DOMIcondens HE 26 C

Страница 1: ... cod 3540Z852 Rev 01 08 2012 DOMIcondens HE 26 C 700 400 330 196 85 115 200 INSTRUCTIONS FOR USE INSTALLATION AND MAINTENANCE ...

Страница 2: ...ating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency Please see installation and servicing guidelines Ferroli declare that no substances harmful to health are contained in the appliance or used during the appliance manufacture B This symbol indicates Caution and is placed next to all safety warnings Strictly follow these inst...

Страница 3: ...display detail 11 fig 1 shows the actual heating delivery temperature and during heating standby time the message d2 Domestic hot water DHW A DHW demand generated by drawing domestic hot water is indicated by flashing of the hot water under the tap on the display The display detail 11 fig 1 shows the actual DHW outlet temperature and during DHW standby time the message d1 Comfort A Comfort demand ...

Страница 4: ...SHIP Incorrect installation can cause damage or injury for which the manufacturer declines any responsibility Installation of this unit must be carried out in strict compliance with the present instructions and the following regulations applicable in Great Britain Gas Safety Regulations Installations Use Local Building Regulations The Building Regulations Part L The Buildings Standards Scotland Co...

Страница 5: ...and the circuit with the non return valve at least 3 m from the boiler or an expansion tank for domestic use For installation follow the instructions contained in the kit Replenishing water It is necessary to provide for replenishing of the water lost by the sealed system Refer to standard BS6798 for the methods of filling and replenishing water in sealed systems There must not be a direct connect...

Страница 6: ...e following extraction suction systems Before installation check and carefully observe the above prescriptions Also comply with the provisions concerning the positioning of wall and or roof terminals and the minimum distances from windows walls vents etc Expansion A For fume exhaust pipes longer than 1 metre during installation take in account the natural expansion of the materials when the boiler...

Страница 7: ... case in areas with different pressures The exhaust and intake must not be positioned on opposite walls C6X Intake and exhaust with separately certified pipes EN 1856 1 B2X Intake from installation room and wall or roof exhaust IMPORTANT THE ROOM MUST BE PROVIDED WITH APPROPRIATE VENTILATION Separate ducts Max permissible length 55 meq Baffle to use 0 15 meq Ø 45 15 35 meq Ø 50 35 55 meq No baffle...

Страница 8: ...s to the setting q02 displaying the actually saved value by pressing the DHW buttons If the pressure gauge reading is different from the nominal maximum pressure pro ceed by increases decreases of 1 or 2 units of parameter q02 by pressing the DHW buttons the value is stored after each modification wait 10 seconds for the pressure to stabilise Press the heating button ref 3 fig 1 The card goes to t...

Страница 9: ...thermostat fault Exchangers dirty clogged on water side Clean the exchangers Faulty water circulation Fume thermostat contact open Check the thermostat Wiring disconnected Check the wiring F05 Fume pressure switch fault contact fails to close Wrong card parameter setting Check the card parameter and modify it if necessary Fan fault Wiring disconnected Check the wiring Faulty fan Check the fan Card...

Страница 10: ...lied 14 Safety valve 81 Ignition and detection electrode 16 Fan 114 Water pressure switch 19 Combustion chamber 126 Contact fume thermostat 20 Burner assembly 138 External probe not supplied 21 Main nozzle 139 Room unit not supplied 22 Burner 145 Pressure gauge water gauge 26 Combustion chamber insulation 193 Trap 27 Copper exchanger for heating and hot water 277 Recuperator 28 Fume manifold 278 D...

Страница 11: ...ar 2 Max gas delivery G20 m3 h 2 64 Min gas delivery G20 m3 h 1 06 Burner nozzles G31 no x Ø 11 x 0 79 Gas supply pressure G31 mbar 37 Max gas pressure at burner G31 mbar 35 0 Min gas pressure at burner G31 mbar 5 0 Max gas delivery G31 kg h 1 96 Min gas delivery G31 kg h 0 78 Max working pressure in heating bar 3 PMS Min working pressure in heating bar 0 8 Max heating temperature C 90 tmax Heatin...

Страница 12: ...6 C 12 EN cod 3540Z852 Rev 01 08 2012 5 5 Wiring diagram fig 26 Electrical circuit 81 1kW L N 230V 50 Hz 16 N L 32 L N T T 278 T 42 4 3 2 1 44 38 114 ABM01 193 126 ON DAY 22 0004 REMOVE TO CONNECT THE CLOCK 139 138 72 ...

Страница 13: ......

Страница 14: ...ffect the customer s statutory rights If yes and if required by the manufacturer has a water scale reducer been fitted CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer s instructions and or BS5546 BS6798 Yes If the condensate pipe terminates externally has the pipe diameter been increased and weatherproof insulation fitted Yes ...

Страница 15: ...eer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Operative ID No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments ...

Страница 16: ...rvice Centre on 0843 479 0479 Calls to these numbers are charged at National Rate from BT landlines Calls made from mobile networks may be considerable more Phone numbers Installer Service Engineer BECAUSE OF OUR CONSTANT ENDEAVOUR FOR IMPROVEMENT DETAILS MAY VARY SLIGHTLY FROM THOSE QUOTED IN THESE INSTRUCTIONS ALL SPECIFICATIONS SUBJECT TO CHANGE Please note to avoid incurring unnecessary expens...

Отзывы: