Ferroli 303: 304 Скачать руководство пользователя страница 14

 14 

BOILER WATER CONNECTIONS 

 

The boiler flow and return pipes are terminated with 2 x 1”BSP 
male connections at the rear of the appliance for the 303 and 2 
x 11/4” for the 304 and 305 and 2 x 11/2” for the 306 and 307. 
Water returning from the system should be connected to the 
lower header pipe, with the flow water connection coming from 
a top header pipe. 

All flow and return pipework must be independently supported.  

Plastic plugs fitted on the open ends of the flow and return 
pipes must be removed before connecting the system pipe-
work. 

An air vent must be provided immediately after the flow con-
nection. 

If installing the boiler onto an existing system it is strongly rec-
ommended that the system be thoroughly flushed before con-
necting the boiler. When connecting to a new system it is still 
important to flush the whole system in accordance with the 
relevant standards. 

Note. 

Connection to the boilers using manifolds must use a reverse 
return principle to ensure equal flow distribution through both of 
the modules. 

Connection of opposing flow and return points can be made 
either on the LH side or RH side, dependent upon the particular 
needs of the boiler installation. 

CONDENSATE DRAIN 

Condensate drains are provided on the boiler. These drains 
must be connected to a drainage point on site. All pipework 
and fittings in the condensate drainage system MUST be 
made of plastic solvent weld type - no other materials may be 
used. 

IMPORTANT. 

Any external runs must be insulated to avoid 

freezing in cold weather causing a blockage. 

The routing of the drain must be made to allow a minimum fall 
of 2.5° away from the boiler, throughout its length. 

If the vertical flue header is specified the flue manifold conden-
sate drain connection must also be connected in the same 
manner. 

SEALED SYSTEM REQUIREMENTS 

 

Working pressure 6 bar maximum.

 

Particular  reference  should  be  made  to  BS.  6644  and  Guid-
ance note BG01 "Automatically controlled steam and hot water 
boilers" published by the Health and Safety Executive.

 

The information and guidance given below is not intended 
to override any requirements of either of the above publica-
tions or the requirements of the local authority, gas or water 
undertakings.

 

In general commercial closed pressurised systems are provid-
ed with either manual or automatic water make up.

 

In both instances it will be necessary to fit automatic con-
trols intended to protect the boiler, circulating system and 
ancillary  equipment by shutting down the boiler plant if a 
potentially hazardous situation should arise.

 

Examples of such situations are low water level and operat-
ing pressure or excessive pressure within the system.  De-
pending on circumstances, controls will need to be either 
manual or automatic reset.  In the event of a shutdown both 
visual and audible alarms may be necessary. 

Expansion vessels used must comply with BS. 4814 and must 

be sized on the basis of the total system volume and initial 
charge pressure. 

Initial minimum charge pressure should not be less than 0.5 
bar (7.2psi) and must take account of the static head and 
specification of the pressurising equipment. The maximum 
water temperatures permissible at the point of minimum pres-
sure in the system are specified in Guidance Note PM5. 

When make up water is not provided automatically it will be 
necessary to fit controls which shut down the plant in the 
event of the maximum system pressure approaching to within 
0.35bar (5psi) of the safety valve setting. 

Other British Standards applicable to commercial sealed sys-
tems can be found on page 8. 

Содержание 303: 304

Страница 1: ...NEW CONDENS FS 300 SERIES Cast Aluminium Floor Standing Condensing Boilers for Natural Gas INSTRUCTIONS FOR USE INSTALLATION AND MAINTENANCE Rev 00 12 2015 PB IB300 ...

Страница 2: ...lies with the following EU directives Gas Appliance Directive 2009 142 Efficiency Directive 92 42 Low Voltage Directive 2006 95 Electromagnetic Compatibility Directive 2004 108 EN President andLegalRepresentative NEW CONDENS FS 300 SERIES 0051 ...

Страница 3: ... appliance The installer must abide by the following instructions Read and follow the instructions given in the manuals provided with the appliance Install the appliance in compliance with prevailing legislation and standards Carry out initial commissioning and any checks necessary Explain the installation to the user If maintenance is necessary warn the user of the obligation to check the applian...

Страница 4: ...someone responsible for their safety The unit and its accessories must be appropriately dis posed of in compliance with the current regulations The images given in this manual are a simplified repre sentation of the product In this representation there may be slight and insignificant differences with respect to the product supplied HEALTH SAFETY The electricity at work regulations 1989 The manufac...

Страница 5: ...0 160 150 Structural Characteristics Water Contents l 6 5 8 5 10 5 12 5 14 5 Empty weight kg 107 133 164 196 226 Width mm 420 490 490 580 580 Height mm 1220 1220 1220 1240 1260 Depth mm 755 865 1130 1275 1415 Electrical Specifications Power supply voltage V Hz 230 50 Protection level IP 20 Power consumption W 160 190 260 260 320 Water and Gas Fittings Central heating flow outlet 1 1 1 1 1 Central ...

Страница 6: ...100 233 87 104 302 R 1 R 80 50 304 488 803 1078 934 380 941 111 281 97 156 394 R 1 R 100 80 305 488 1066 1078 949 394 932 120 284 96 160 374 R 1 R 1 110 80 306 583 1213 1138 945 385 963 127 305 97 183 385 R 1 R 1 125 115 307 583 1309 1138 956 396 945 133 311 110 175 433 R 1 R 1 160 115 ...

Страница 7: ...nt 600mm except access doors may be closer but not less than 200mm and 600mm must still be available for service across the width of the boiler Rear 1000mm or adequate space from the rear of the jacket to make the flue connections and access to the flue sample point drain connection flue and any safety or control devices Top 800mm Left side 800mm Right side 800mm Between boilers 200mm Recommended Min...

Страница 8: ...s in buildings BS 6880 1 1988 Code of practice for low temperature hot water heating systems of output greater than 45 kW Funda mental and design considerations BS 6880 2 1988 Selection of equipment BS 6880 3 1988 Installation commissioning and maintenance BS EN 13384 1 2015 Chimneys Thermal and fluid dynamic calculation methods Chimneys serving one heating appliance BS EN 13384 2 2015 Chimneys Th...

Страница 9: ... soundness and purged in accordance with the appropriate standards Gas Boosters A gas booster is required if the gas pressure available at the boiler is lower than that required by the boiler manufacturer to attain the flow rate for maximum burner input rating Location of the booster requires careful consideration but should preferably be closer to the burner rather than the gas meter Ventilation s...

Страница 10: ...om a clean source outside the boiler room building Where it is not possible to duct air from outside the boiler the air inlet guard MUST be used Material With no requirement for buoyancy to discharge flue products and with low flue gas temperatures single wall flues are suitable for most installations Care should still be taken to maintain compliance with building regulations and relevant standards T...

Страница 11: ...s a pump must be sup plied from the terminals inside the boiler Note for pumps requiring greater than 1 0 amp current they must be con nected via a relay When sizing pumps reference should be made to the Hydraulic Resistance Table on page 12 which show the boiler resistance against flow rates to achieve the required temperature differential Flow rates for common systems using either 11o C or 20o C ...

Страница 12: ...H value and the volume of top up water used It is most important that the correct concentration of the water treatment products is maintained in accordance with the manu facturers instructions If the boiler is installed in an existing system any unsuitable additives MUST be removed by thorough cleansing In hard water areas treatment to prevent lime scale may be necessary In this instance the use o...

Страница 13: ... not show safety valves wa ter flow switches etc necessary for the safe operation of the system Cold Feed Pipe Sizes Open Vent Pipe Sizes OPEN VENTED SYSTEM REQUIREMENTS Detail reference should be made to the appropriate standards listed on page 8 The information and guidance given below is not intended to override any requirements of the above publications or the requirements of the local authorit...

Страница 14: ...er is specified the flue manifold conden sate drain connection must also be connected in the same manner SEALED SYSTEM REQUIREMENTS Working pressure 6 bar maximum Particular reference should be made to BS 6644 and Guid ance note BG01 Automatically controlled steam and hot water boilers published by the Health and Safety Executive The information and guidance given below is not intended to override a...

Страница 15: ... should be 3 core PVC insulated cable NOT LESS than 0 75mm2 24 x 0 2 mm and to BS 6500 The fuse rating should be 7A Wiring external to the boiler MUST be in accordance with the current I E E BS7671 wiring Regulations and any local regu lations For Ireland reference should be made to the current ETCI rules for electrical installations Connection should be made in a way that allows complete isolatio...

Страница 16: ...16 Wiring diagram ...

Страница 17: ...17 Sensor locations ...

Страница 18: ... drain system and trap Ensure the water is circulating correctly between the boiler and the system Ensure the gas valve modulates correctly in heating and domestic hot water modes Put the boiler through several ignition sequences to ensure correct firing operation Using a combustion analyser connected to the boiler flue outlet check that the CO2 content in the fumes with the boiler operating at ma...

Страница 19: ...he units memory the information button will need to be pressed again until a percentage figure is shown on the screen Fig 2 The display now shows the boilers power output as a percentage Press the confirmation button once The figure will now flash intermittently Rotate the selection dial until the figure reads 100 Fig 3 Press the confirmation button once more to save this value To reduce the boile...

Страница 20: ...chieve the correct CO2 reading shown in the table below Clockwise to decrease anti clockwise to increase Minimum rate adjustment Adjust the modulation rate to minimum 0 as described on page 19 Allow combustion and flame to stabilise then compare CO2 reading to that given in the table below To adjust remove adjustment cover with a flat blade screwdriver Using a 40Torx driver adjust CO2 Clockwise to...

Страница 21: ... operation Regular attention will also prolong the life of the boiler and should preferably be performed at the end of the heating season After servicing complete the service section of the log book and return to the owner or their representative Recommend that a contract for this work should be made with the regional gas authority or a Gas Safe Registered Engineer In IE servicing work must be car...

Страница 22: ...22 Notes ...

Страница 23: ...23 ...

Страница 24: ...24 FERROLI S p A Via Ritonda 78 a 37047 San Bonifacio Verona ITALY www ferroli it ...

Отзывы: