52
ZMLE
Rev. 2.0
TRANSPORT AND INSTALLATION
4.13
04-Rimozione imballo (ZMLE)
6
7
9
8
8
8
8
10
►
Left coupling:
the procedure is the same, bearing in mind that the hose support bracket (
6
) must be fastened
to the three-point hitch so that the hoses pass inside the arch.
FERRI Srl declines all responsibility for damage caused by the incorrect assembly of
the parts.
CAUTION
Содержание ZMLE Series
Страница 2: ......
Страница 6: ...6 ZMLE Rev 2 0 TABLE OF CONTENTS Page left intentionally blank INDICE...
Страница 44: ...44 ZMLE Rev 2 0 TECHNICAL CHARACTERISTICS Page left intentionally blank 03 Comandi con distributore...
Страница 81: ...81 Rev 2 0 ZMLE USE AND OPERATION 6 17 06 Posizione di trasporto ZMLE A 1 A B C E D 2 2...
Страница 83: ...83 Rev 2 0 ZMLE USE AND OPERATION 6 18 06 Posizione di trasporto ZMLE A 1 2 2 B A E C A...
Страница 84: ...84 ZMLE Rev 2 0 USE AND OPERATION Page left intentionally blank 06 Posizione di trasporto ZMLE...
Страница 98: ...98 ZMLE Rev 2 0 ROUTINE MAINTENANCE Page left intentionally blank 07 Messa in parcheggio o deposito THFLC...
Страница 114: ...114 ZMLE Rev 2 0 SCRAPPING AND DISPOSAL Page left intentionally blank 10 DEMOLIZIONE E SMALTIMENTO...
Страница 116: ...116 ZMLE Rev 2 0 WARRANTY Page left intentionally blank 11 GARANZIA...
Страница 122: ...122 ZMLE Rev 2 0 OPTIONAL UNITS Page left intentionally blank 12 Comandi con distributore ZMT ZMTE...
Страница 123: ...NOTES...