101
Rev. 2.0
ZMLE
EXTRAORDINARY MAINTENANCE
8.2
08-Sostituzione delle pulegge
2
3
1
8.2 Pulley replacement
The pulleys are fixed to their relative shafts using a taper bush (
1
).
To disassemble the pulley proceed as follows:
1)
Loosen the screws (
2
) with the appropriate wrench;
2)
Remove the screws (
2
) and insert them in the threaded holes (
3
) tightening uniformly;
3)
After a few turns of the screws the pulley should be extracted easily from the shaft.
To assemble the pulleys proceed as follows:
1)
Insert the taper bush (
1
) in the pulley holes;
2)
Couple the entire unit to the shaft, ensuring the pulley is in the correct position;
3)
Tighten the screws uniformly (
2
) with the appropriate torque wrench M=35Nm.
Carry out a visual check of all the belts before fitting them.
In the event that deterioration is noted even if only on one belt, change the whole set.
CAUTION
Содержание ZMLE Series
Страница 2: ......
Страница 6: ...6 ZMLE Rev 2 0 TABLE OF CONTENTS Page left intentionally blank INDICE...
Страница 44: ...44 ZMLE Rev 2 0 TECHNICAL CHARACTERISTICS Page left intentionally blank 03 Comandi con distributore...
Страница 81: ...81 Rev 2 0 ZMLE USE AND OPERATION 6 17 06 Posizione di trasporto ZMLE A 1 A B C E D 2 2...
Страница 83: ...83 Rev 2 0 ZMLE USE AND OPERATION 6 18 06 Posizione di trasporto ZMLE A 1 2 2 B A E C A...
Страница 84: ...84 ZMLE Rev 2 0 USE AND OPERATION Page left intentionally blank 06 Posizione di trasporto ZMLE...
Страница 98: ...98 ZMLE Rev 2 0 ROUTINE MAINTENANCE Page left intentionally blank 07 Messa in parcheggio o deposito THFLC...
Страница 114: ...114 ZMLE Rev 2 0 SCRAPPING AND DISPOSAL Page left intentionally blank 10 DEMOLIZIONE E SMALTIMENTO...
Страница 116: ...116 ZMLE Rev 2 0 WARRANTY Page left intentionally blank 11 GARANZIA...
Страница 122: ...122 ZMLE Rev 2 0 OPTIONAL UNITS Page left intentionally blank 12 Comandi con distributore ZMT ZMTE...
Страница 123: ...NOTES...