TM
11
Moving the Ferret along the leaking pipe
3.1 Inflating the Ferret to block the pipe
Step 1.
Turn the Flow Valve off.
Step 2.
Turn the Ferret Pump to
inflate the Ferret to
approximately 1bar (15psi)
above the working pressure.
Step 3.
Turn the Flow Valve back
on and wait for the Flow
Gauge to stop.
IMPORTANT:
If the Ferret starts to move or the Ferret
Winder turns, close the Flow Valve and
increase the pressure in the Ferret,
then
open Flow Valve again.