background image

15

15

ENGLISH

7. PREVENTION SYSTEMS
About braking system failure

Equip with winch according to BGV D8 y 2006/42 CE directive.

About loss of stability

Maintenance of ground support tower stability must basically be as per the following measures: 

• Professionalization, training and risk awareness of ground support tower users.

• Equip with different safety devices and advices from the manufacturer to reinforce stability, 

as: 

- Bubble level to help vertical adjustment.

- Specify maximum load that the ground support tower can raise.

About objects falling to a different level, knocks and/or contusions with objects

The risk of objects falling to a different level can be prevented by using homologated safety 

elements, e.g., a safety pin which fixes the inner profile of the ground support tower in its 

working position, so the cable does not support load and guaranteeing the impossibility of a 

drop. In the event of cable breakage, the braking system will act automatically. Furthermore, if 

steel elements have been zinc coated it protects the entire unit from oxidation and corrosion.
These risks can also be minimised with correct ground support tower maintenance. The user 

must perform periodical inspections on safety elements and make the necessary repairs in 

case deficiencies are detected.
Moreover, the consequences of these risks can be reduced limiting an access area to the 

ground support tower and with a correct training of personnel.

About noise emissions

This equipment does not produce more than 80 dB.

Содержание TRC-700

Страница 1: ...serie Serial No Instrucciones Instructions Fabricante Manufacturer FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenix...

Страница 2: ...y the conformity of the product to which this declaration refers as per the following regulations 2006 42 CE Person empowered to compile the technical file and authorised represntative M Julia Niza de...

Страница 3: ...DE SEGURIDAD 5 4 INSTRUCCIONES DE USO 6 5 MANTENIMIENTO 8 6 RIESGOS ESPEC FICOS 8 7 SISTEMAS DE PREVENCI N 9 INDEX 1 INTRODUCTION 10 2 GENERAL DATA 10 2 1 Technical data 10 2 2 Applicable regulations...

Страница 4: ...TORRE ESTRUCTURAL Modelo TRC 700 Caracter sticas t cnicas Altura m xima 7m Altura m nima 1 40m Carga m xima 600kg Material Acero seg n EN 10305 5 Aluminio EN AW 6082 T6 rea de la base abierta 2 02 x...

Страница 5: ...ral en suelo firme y aseg relo con la ayuda de tirantes Nunca fije un tirante sobre un veh culo ni cualquier otro elemento que pueda desplazarse No usar escaleras encima de la torre estructural ni apo...

Страница 6: ...do el nivel de burbuja estabilizador L de la base 4 Sacar el contrapeso P de su posici n e insertar en su alojamiento de trabajo N usando el pasador F 5 Montar el per metro de truss al carro C conform...

Страница 7: ...pectivos pasadores Se necesitar una carga m nima estable de 90kg en el contrapeso P para la elevaci n de la torre estructural 8 Enganchar el gancho J en el grillete Z del carro C y elevarlo girando la...

Страница 8: ...ficiencias en el sistema de frenado o por una mala instalaci n Si deja de funcionar puede provocar un riesgo importante de p rdida de control de la mercanc a elevada y originar golpes y o contusiones...

Страница 9: ...a distinto nivel golpes y o contusiones con objetos El riesgo de ca da de objetos a distinto nivel puede prevenirse con la utilizaci n de elementos de seguridad homologados por ejemplo un gatillo de...

Страница 10: ...al characteristics Maximum height 7m Minimum height 1 40m Maximum load 600kg Minimum load 25kg Material Steel EN 10305 5 Aluminium EN AW 6082 T6 Open base area 2 02 x 1 77m Closed base area 0 995 x 0...

Страница 11: ...lifting tower or lean against it for any kind of work Beware of any kind of projection above the lifting tower like cornices balconies luminous signs etc It is very important to avoid the presence of...

Страница 12: ...abilizing bubble level L located at the base 4 Remove the counterweight P from its position and insert it into its working position N using the pin F 5 Assemble the truss perimeter to the sleeveblock...

Страница 13: ...pins A minimum stable load of 90kg on the counterweight P will be required for the lifting of the ground support tower 8 Hook the hook J into the shackle Z of the sleeveblock C and lift it by turning...

Страница 14: ...anufacturer or an authorised distributor within your territory 6 SPECIFIC RISKS Braking system failure May occur due to braking system deficiencies or bad installation If it stops working it could cau...

Страница 15: ...be prevented by using homologated safety elements e g a safety pin which fixes the inner profile of the ground support tower in its working position so the cable does not support load and guaranteeing...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19 NOTAS NOTES LIFTING TOWERS...

Страница 20: ...FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Espa a Tel 34 96 125 08 55 export fenixstage com www fenixstage com www fenixstage com...

Отзывы: