background image

Configuration Wizard

1. Select the menu language. 
2. Set the country of the system operation and the network type. 
3. Set the date and time.
4. In order to save the country settings and network type, confirm with "Yes".
         

You have completed the initial configuration.

blueplanet

ESC

!

Hauptmenü

Messwerte

Informationen
Hersteller

WR-Typ
SW-Version
Seriennummer
Land anzeigen

Einstellungen

Configuration of the inverter KACO blueplanet gridsave 50.0 TL3-S

The USB interface is located on the communication board inside the housing door.

1. connect the USB stick to the device
2. if you want to perform the update, select the "Yes" button. If "No", pressing the "Enter" button 
will cancel the update process and the device will start feeding operation.
In the event of an error, you must repeat the update process.

In Austria the firmware update is mandatory - contact your FENECON 
contact person for the update file.

Check the software version in the main menu item under the information SW version       PKT:V5.56

Perform firmware update 

see blueplanet gridsave 50.0 TL3 

Software Update Guide V5.59

Country settings can be then changed via the password-protected parameter menu. The password must be 
requested from KACO service.

Copyright by FENECON GmbH

44

Does not replace the operating instructions of the KACO blueplanet gridsave 50.0TL3-S

Содержание Commercial 50

Страница 1: ...Quick Installation Guide Commercial 50 V2023 08...

Страница 2: ...oint Meter at GCP Battery inverter Current transformer at producer Voltage tap GCP Supply FEMS 3G1 5 Battery rack Copyright by FENECON GmbH 5G35 RCD 100 0 3A optional NH 100A 2 FEMS box min B10 Operat...

Страница 3: ...00V 230V Grid LAN Ethernet CAT 6 2x35 DC High Voltage Battery racks Copyright by FENECON GmbH Battery string combiner box Battery racks 5G35 RCD 100 0 3A optional NH 100A 3 c The left part meter PV in...

Страница 4: ...installation FEMS box Battery inverter Copyright by FENECON GmbH Battery racks 5G35 RCD 100 0 3A optional NH 100A 4 5G35 RCD 100 0 3A optional NH 100A The left part meter and PV inverter is the same...

Страница 5: ...drawn to scale System Structure Diagram in case of mutiple inverter installation FEMS box Battery inverter Copyright by FENECON GmbH Battery racks 5 400V 230V Grid LAN Ethernet CAT 6 2x35 DC High Volt...

Страница 6: ...aph the serial numbers of the individual components as these must be documented later at the IBN in the IBN log or IBN assistant Note Not all possible system configurations are shown in this quick ins...

Страница 7: ...the inverter 400 mm At least 2 people are needed to mount the inverter and the housing Weight of inverter 75 kg Dimensions inverter W D H 500 760 425 mm 300 mm 400 mm 400 mm 500 mm 7 The KACO inverter...

Страница 8: ...e the packing material inside the cardboard box 2 Mark the position for mounting on the wall 3 Mark the position of the drill holes using the recesses in the mount 4 Fasten the wall mount upright to t...

Страница 9: ...sing the handles on the side Never lift by using the lid or the cover Hook the device into the holder via the housing recess on the rear side Note lower marking on the housing must stand out over the...

Страница 10: ...the FEMS box on the wall using the cutouts for drill holes 3 Mount the box on the wall using suitable fastening material use a spirit level for help Mounting material is not included in the scope of d...

Страница 11: ...installed c IP protection classification IP66 Dimensions W D H 400 200 600 mm Weight 15 kg 1 Hold the battery string combiner box at the desired position on the wall 2 Mark the position of the battery...

Страница 12: ...k with the battery modules and the BMS is designed for indoor use In general when choosing the installation location pay attention to the protection class which corresponds to IP21 Outdoor rack can be...

Страница 13: ...etailed information on the outdoor rack with regard to assembly and installation can be found in the separate instructions These can be found on our website in the download center Ambient temperature...

Страница 14: ...e racks are provided with equipotential bonding At least 10 mm2 cable not included in the scope of delivery fastening material hexagon nut washer spring lockwasher external serrated lock washer and ri...

Страница 15: ...ery Rack 4 Information concerning BMS Module Master BMS Dimensions W D H 180 x 465 x 320 mm Weight 13 5 kg Submaster BMS Dimensions W D H 180 x 465 x 320 mm Weight 12 kg Battery Module Dimensions W D...

Страница 16: ...one inverter string collection box a master BMS and a submaster BMS are used In an AC cluster several BMS strings with several inverters one master BMS is used per inverter 1 Remove the packaging mat...

Страница 17: ...l modules BMS are grounded Make sure to use the serrated serrated lock washers contact washers included in the scope of delivery serration is located on the mounting bracket Remove the protective caps...

Страница 18: ...ng within the Rack 1 Hints for wiring the battery racks Make sure that the plugs snap audibly into place when wiring the DC lines Unlocking is possible on the side of the plug 18 Copyright by FENECON...

Страница 19: ...dule 1 first module below BMS box port Communication cable 410 mmRJ45 connectors for connection from master BMS Connection MODULE OUT to battery module 1 first module below the BMS box MODULE IN conne...

Страница 20: ...tery module there is a DC cable 250 mm and a communication cable 300 mm DC cable black 250 mm 25 mm Connector orange black for connection between battery modules from terminal to Communication cable 3...

Страница 21: ...rom the first to the second bottom from the second to the third top DC cable black 1000 mm 25 mm Connector orange black for connection between battery modules from to for connection of several racks f...

Страница 22: ...ster BMS port MODULE to module 1 first module below BMS box port Kommunikationskabel 410 mm RJ45 Anschl sse zur Verbindung vom Master BMS Anschluss MODULE OUT zum Batteriemodul 1 erstes Modul unterhal...

Страница 23: ...from the first to the second bottom from the second to the third top DC cable black 1000 mm 25 mm Connector orange black for connection between battery modules from to for connection of several racks...

Страница 24: ...cation Ethernet To connect rack 1 Master BMS port PARALLEL OUT to Submaster BMS port PARALLEL IN Resistor gray into PARALLEL OUT port on submaster BMS 24 Wiring within the Rack in case a submaster BMS...

Страница 25: ...lay ports in the same way as masters 1 2 and 3 3 Communication to meter see separate instructions for installation and configuration of the meter 4 Communication to inverter LAN Ethernet RJ45 5 Connec...

Страница 26: ...r BMS box 8 pin connector Pin 4 Wire no 1 of FEMS connection box Relay board connection 8 Pin L To master BMS box 8 pin connector Pin 3 Wire no 2 of FEMS connection box Relay board connection 8 Pin NC...

Страница 27: ...ON GmbH 27 Connection FEMS box with Master BMS To the connection Ethernet 4 3 2 at the switch in the FEMS connection box Pin 3 Wire No 2 Pin 4 Wire No 1 To the relay board in the FEMS connection box C...

Страница 28: ...FENECON GmbH Wiring of KACO Inverter In case of a separate PE and N connection the PEN jumper must be removed L1 L2 L3 PEN N 1 Loosen the screws 2 Remove cover 3 Loosen screws 4 Remove PEN bridge L1...

Страница 29: ...talled Power Out 3 Communication FEMS LAN 4 Communication to additional inverters 5 AC grid connection AC connection cable not included in the scope of delivery 1 Cut off DC cable end to required leng...

Страница 30: ...th Master BMS Box and FEMS Box L 1 L 2 L 3 N PEN 160 A PE L1 L2 L3 N PEN Grid connection Copyright by FENECON GmbH LAN RJ45 30 Ethernet 6 connection on the switch in the FEMS box DC cable 5 meter are...

Страница 31: ...3 N PEN c 125 A ON Connection of the Battery String Combiner Box to Inverter in case a submaster BMS is installed Press 35 mm ferrules onto the DC cable included in delivery Copyright by FENECON GmbH...

Страница 32: ...nection of the Battery String Combiner Box to BMS boxes in case a submaster BMS is installed c 125 A ON Press ring cable lugs 35 mm M10 onto the DC cable included in delivery 32 DC cable 5 meter are i...

Страница 33: ...d this on our website in the download center 33 The meter package includes the SOCOMEC Diris A10 meter and the corresponding FEMS app for Socomec meters The current transformers are not part of the de...

Страница 34: ...our website in the download center 34 The meter package includes the KDK 2PU CT meter and the corresponding FEMS app for KDK meters The current transformers are not part of the delivery Note Meters fo...

Страница 35: ...on the submaster BMS boxes if present from OFF to ON 4 To switch on press the Power button on the submaster BMS boxes if present 5 Turn the Main Switch on the master BMS box from OFF to ON 6 To switch...

Страница 36: ...ss the MASTER POWER button again For systems which were delivered as of July 2023 the Configuration for TCP communication can be skipped since the settings are already preconfigured for these systems...

Страница 37: ...n the Ethernet settings on the PC laptop 4 Click on the Change adapter options button 5 Now there are different Ethernet connections to choose from Select here the connection to the master BMS with a...

Страница 38: ...ield Properties another window is opened In this window the line Internet protocol Version 4 TCP IPv4 must be selected Again a window opens here the selection option Use the following IP address must...

Страница 39: ...9 Configuration for TCP Communication 7 Open now any browser 8 Enter the following IP address in the adress bar 192 168 0 7 9 In the field that appears you must enter admin for the username AND the pa...

Страница 40: ...ommunication 11 Now select the Serial Port tab on the left side of the page 12 In the line Work Mode the setting TCP Server must be selected By default TCP Client is usually selected 13 This setting m...

Страница 41: ...ication Finally the connection between Master BMS and laptop PC must be disconnected again In addition the connection between the Master BMS and the FEMS box must be re established To do this reconnec...

Страница 42: ...ch one after the other In addition the Static IP must be changed for further Master BMS 1 To do this select the Local IP Config tab on the left side of the page 2 Make sure that the Static IP is conse...

Страница 43: ...be requested from KACO service The AC and DC power supply must be ensured during initial commissioning Does not replace the operating instructions of the KACO blueplanet gridsave 50 0TL3 S 1 To selec...

Страница 44: ...evice 2 if you want to perform the update select the Yes button If No pressing the Enter button will cancel the update process and the device will start feeding operation In the event of an error you...

Страница 45: ...blueplanet ESC 0 00 Datum Uhrzeit KW 1 365 0kWh 0kWh Start interface Use the right key to enter the main menu to make settings Copyright by FENECON GmbH 45 Does not replace the operating instructions...

Страница 46: ...anet ESC Einstellungen DHCP IP Adresse Subnetzmaske Gateway DNS Server Webserver Modbus TCP Sprache Ges Energie def Logging Intervall Logdaten Backup Display Datum Uhrzeit Netzwerk Settings Network Ne...

Страница 47: ...e Subnetzmaske Gateway DNS Server Webserver Modbus TCP IP Adresse 010 004 000 010 Select DHCP Off with confirm Copyright by FENECON GmbH Quick configuration network inverter KACO 47 Input the IP Addre...

Страница 48: ...eplanet ESC Hauptmen DHCP IP Adresse Subnetzmaske Gateway DNS Server Webserver Modbus TCP IP Adresse 010 004 000 010 Input the IP Addresse via the 4 way push button 010 004 000 010 and confirm Inverte...

Страница 49: ...bnetzmaske Gateway DNS Server Webserver Modbus TCP Betriebsmodus Port Fern Konfiguration Fern Update Webserver remote configuration Copyright by FENECON GmbH Quick configuration network inverter KACO...

Страница 50: ...et ESC Hauptmen Fern Update Ein Aus Betriebsmodus Port Fern Konfiguration Fern Update Remote configuration On confirm with Remote update On confirm with Copyright by FENECON GmbH Quick configuration n...

Страница 51: ...ebsanleitung vom KACO blueplanet gridsave 50 0TL3 S blueplanet ESC 10 00 Datum Uhrzeit KW 1 365 10kWh 10kWh return to start display graphic display ESC Copyright by FENECON GmbH Quick configuration ne...

Страница 52: ...ce team see information on the right If you use other additional apps such as heating element EV charging stations please also contact our service team For telephone commissioning please make an appoi...

Страница 53: ...staller account has been created yet this can be done directly on the login page NOTE The access data for monitoring are created after completion of the IBN and sent to the customer NOTE After enterin...

Страница 54: ...ion of the installed meters are successfully completed the appropriate values are displayed in the online monitoring NOTE When the configuration is completed you will be redirected to the online monit...

Страница 55: ...__________________________________________________ ______________________________________________________________________________________________________________________________ ______________________...

Отзывы: