
Consumer
Single-phased representation, not drawn to scale.
System Structure Diagram
in case of submaster BMS installation
Battery inverter
400V/230V Grid
LAN (Ethernet CAT 6)
2x35 DC High Voltage
Battery racks
Copyright by FENECON GmbH
Battery string combiner box
Battery racks
5G35
RCD 100/0,3A (optional)
NH 100A
3
c
The left part (meter, PV
inverter and FEMS box +
connection FEMS box to
inverter and master BMS) is
the same as the standard
system layout diagram!
(see previous page
–
p. 2)