
11
AXISS DIGITAL SMARTVIEW INSTALLATION GUIDE
15V ACCU
EXT
RS-232
MOTOR
TLI
A
UX
MOUNTING FOR NOG (RECOMMENDED)
6
Mark the position of the Temperature & Flow Control Unit fixing holes
in the selected location
Important:
The location of the Temperature & Flow
Control Unit must be acessible and dry. Use the
processor template on the last page to mark the
position of the fixing holes in the selected location.
ORIENTATION FOR WALL SITUATION:
MOUNTING OPTIONS
MOUNTING FOR CONCRETE
1
Install the Temperature & Flow Control Unit
1
Drill fixing holes
99 mm
56 mm
ø
5 mm / 0.2˝
2
Install the Temperature & Flow Control Unit
15V ACCU
EXT
RS-232
MOTOR
TLI
A
UX
Refer to Scope of Application on p6 for the plumbing layout