ROUTING
BOTTOM BRACKET
CABLE GUIDE
ROUTING
BOTTOM BRACKET
CABLE GUIDE
9
8
Thread the supplied cable liners over each cable. This will keep the cable liners
from crimping and creating friction during the routing process.
Start by threading the front derailleur cable through the port found on the non-drive
side of the downtube. The cable will exit at the port found on the underside of the
bottom bracket.
Now replicate this step on the drive side for the rear derailleur cable. This cable will
also be exiting the port found on the underside of the bottom bracket.
Once both cables are exiting the port found on the underside of the bottom bracket,
you want make sure they are running parallel to each other before crossing them
over each other a single time.
Содержание VR SERIES
Страница 1: ...VR SERIES TECHNICAL MANUAL...
Страница 5: ...Di2 2x11 ROUTING 2x11 MECHANICAL 7 6 ROUTING...
Страница 9: ...GROMMET MAP GROMMET MAP CONT 15 14...