2
ENGLISH
TOOLS REQUIRED FOR INSTALLATION
PACKAGING CONTENTS
NOTE:
Three people are recommended for easy and proper installation
NOTE:
We recommend removing adjacent ceiling tiles for
easiest installation
NOTE:
It is required to remove one cross-tee in the ceiling grid, which will
make installation much easier
NOTE
: Do not install next to a return or register
NOTE
: Shut off circuit breaker to installation area before
beginning installation
INSTALLATION INSTRUCTIONS
Before beginning installation, ensure that a
qualified electrician has run a 120V circuit
to the installation area. Remove unit from
packaging and stage on a tabletop or other
surface under or near installation area with
door facing upwards.
Open unit door by depressing the latch button
and pulling upward. Have one person hold the
door open for the next few steps or the hinges
can be damaged.
NOTE: do not remove corrugate support trays
attached to door yet.
Disengage the filter clamp lever until a click
is heard.
1
2
3
• Gloves
• Ladder/Step Stool
• UL Elbow or Conduit
• Wire Nuts
• Level
• Tape
• Unobstructed 24” x 24” drop ceiling grid with at least 24” clearance above
the drop ceiling
• Mounting hooks or location installed to local code and capable of holding
the weight of the system
• For ease of installation and optimal placement of unit in the grid, it is
HIGHLY RECOMMENDED that either hooks be drilled into the ceiling, or strut
channels be used to loop cables if there are no existing mounting points
available above the perimeter of the housing.
• Air Purifier (1X)
• Hybrid Filters w/ Pre-Filter (1X)
• 16ft mounting cables with clutches (4X)
• Centering Blocks (4X)
• User Manual (1X)
Содержание Array AR1
Страница 15: ...15...