Auto Start Charge: Percent SOC below Auto Start Charge, system will AutoStart
to charge the battery bank from the generator(or the power grid).
Exit Charge: Percent SOC reach Exit Charge, system will stop charging the battery bank from the 
generator(or the power grid).
Charge Current: Charge rate of Charge Current from the attached generator(or the power grid) in 
Amps.
Gen Charge Enable: uses the gen input of the system to charge battery bank from an attached 
generator, it is the main switch apply to all system work mode.
Gen State Signal: Normally open relay that closes when the Gen Charge Enable is active.
Gen Max Run Time: It indicates the longest time Generator can run in one day, when time is up, the 
Generator will be turned off. 24H means that it will not shut down all the time.
Note: The setting method about Grid is the same to the Gen in this page.
Note: if the setting is conflict, The Grid priority is higher than Gen in all system work mode.  

Lithium protocol: This is BMS protocol. Please reference the document(Approved Battery).
Bat Shutdown: It indicates the inverter will shutdown if the SOC below this value.
Bat Low Batt: It indicates the inverter will alarm if the SOC below this value.
Bat Restart: It indicates the inverter will restart if the SOC above this value.
Bat Constant V: It indicates the Battery will charge to this value when Bat Mode is Use Batt V.
Bat Float V: It indicates the Battery will charge to this value after battery voltage reachs Bat 
Constant V and charge current is below than 5A last for 10min in Bat Mode is Use Batt V.

System Work Mode:
Selling First: This Mode allows hybrid inverter to sell back any excess power produced by the solar 
panels to the grid. If Time Of Use is active, the battery energy also can be sold into grid.
The PV energy will be used to power the load and charge the battery and then excess energy will 
flow to grid.
Power source priority for the load is as follows:
1. Solar Panels.
2. Grid.
3. Batteries (until programable SOC discharge is reached).
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The 
hybrid inverter will neither provide power to the home load nor sell power to grid. The built-in CT 
will detect power flowing back to the grid and will reduce the power of the inverter only to supply 
the backup load and charge the battery.
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also 
give power to the home load connected. If PV power and battery power is insufficient, it will take 
grid energy as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is 
needed. The installation method of the CT please refer to chapter xx CT Connection. The external 
CT will detect power flowing back to the grid and will reduce the power of the inverter only to supply 
the backup load, charge battery and home load.
Solar Sell: “Solar sell” is supplement for Zero Export To Load or Zero Export To CT: when this item is 
active, the surplus PV energy can be sold back to grid too. When it is active, PV Power source 
priority usage is as follows: load consumption and charge battery and feed into grid.
Dispatch Mode: Receive power scheduling instructions by the energy management system (EMS), if 
ticked, inverter will charge or discharge base on the Active Power setting.in Dispatch Mode, the 
battery power can be sold into grid.
Active Power: the charge power(Active Power greater than 0) or discharge power(Active Power less 
than 0) in the Dispatch Mode.
Max. Sell power: Allowed the maximum output power to flow to grid.
Zero-export Power: for Zero Export To Load or Zero Export To CT, and the “Solar sell” is not active. it 
tells the grid output power threshold to ensure the hybrid inverter won' t feed power to grid.
Energy Pattern: PV Power source priority.
Batt First: PV power is firstly used to charge the battery and then used to power the load. If PV 
power is insufficient, grid will make supplement for battery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the battery. If PV 
power is insufficient, Grid will provide power to load, but neither the battery power to load nor the 
Grid charge to battery.
Note: Batt First and Load First are suitable to Selling First(Time Of Use is not active) and Zero 
Export To Load and Zero Export To CT.

5.5 System Work Mode

Содержание HY-50K-HT

Страница 1: ...358 010351 00A HY 50K HT...

Страница 2: ...ntact Signal 4 6 DRMS Connection 4 7 Lithium Battery Communication 4 8 Installation of WIFI module 4 9 Wiring System 4 10 Typical application diagram of diesel generatol 5 Display and operation 5 1 Op...

Страница 3: ...lectrical parts even cause an explosion Please strictly follow installation procedure when you want to disconnect AC or DC terminals Please refer to Installation section of this manual for the details...

Страница 4: ...ce Time of use function Smart Load Function Basic System Architecture The following illustration shows basic application of this inverter It also includes following devices to have a complete running...

Страница 5: ...COM connector 1 2 3 4 5 6 No Name Expansion Bolts M5 combination screw M10 Allen wrench M5 Allen wrench Meter CT optional 7 8 Battery connector 3 3 Installation Environment Figure 2 2 3 Paper packages...

Страница 6: ...n the cover of the inverter or replace any part as incomplete inverter may cause electric shock and damage the device during operation Figure 3 3 2 Installation position The installation of inverter s...

Страница 7: ...lation resistance to ground of the PV string must exceed 19 33k in case of any shock hazard 3 PV string could not connect to earth grounding conductor 4 Use the right PV plugs in the accessory box Ste...

Страница 8: ...ommended table of AC circuit breakers INVERTER MODEL AC BREAKER SPECIFIFICATION FLS 50KTH S0 72A 400V 4P The absence of AC breaker on back up side will lead to inverter damage if an electrical short c...

Страница 9: ...fore connecting AC cable 13 14 A B C D Outside diameter Separated wire length Conductor wire length Conductor core section 30 40mm 200 250mm 20 25mm 15 20mm A B C D Connection terminal Screw Cap Cable...

Страница 10: ...e 7 8 Meter 485B Table 4 4 1 RS485 interface 2 Meter 485A 15 16 L3 CT3 CT2 CT1 L2 L1 N PE Grid Red line Black line Black line Black line Red line Red line L3 L2 L1 N PE Grid L3 L2 L1 N PE CT3 CT2 CT1...

Страница 11: ...7 8 DRM1 5 DRM2 6 DRM3 7 DRM4 8 REF COM 17 18...

Страница 12: ...MS Port On IVGM 8 1 8 1 Power Supply Lithium Battery Communication 19 20 DC Breaker AC Breaker AC Breaker GRID PE N L1 L2 L3 L1 L2 L3 N PE N L1 L2 L3 PE CT1 CT2 CT3 Ground AC Breaker AC Breaker 4 9 Wi...

Страница 13: ...C AC Normal Alarm Green led solid light Green led solid light Green led solid light Red led solid light Messages PV Connection normal Grid Connection normal Inverter operating normal Malfunction or wa...

Страница 14: ...nto the power curve page 1 Back up Power 2 Voltage Power for each Phase 3 Daily and total backup consump on 23 24 This is Grid detail page Press the Energy button will enter into the power curve page...

Страница 15: ...ackup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power owing back to the grid and will reduce the power of the in...

Страница 16: ...e the battery until the SOC reaches 40 At the same time if battery SOC is lower than 40 then grid will charge the battery SOC to 40 During 12 00 14 00 if battery SOC is lower than 90 it will use grid...

Страница 17: ...dervoltage protection point and protection time LV5 Level 5 undervoltage protection point and protection time Voltage Unbalance Grid voltage unbalance percentage protection point and protection time H...

Страница 18: ...l response to a new PF 0 9 Inductive reactive power Lock in Pn When the inverter output active power is higher then Lock in Pn rated power it will enter the P PF mode Lock out Pn When the inverter out...

Страница 19: ...ver frequency protection point and protection time HF2 Level 2 over frequency protection point and protection time LF1 Level 1 under frequency protection point and protection time LF2 Level 2 under fr...

Страница 20: ...nergy Distribution Priority Load BAT Grid 6 Work Mode 35 36 ECO mode During Charge Priority time period load is rst supplied with grid power If there is excess solar power after battery charging the e...

Страница 21: ...d 1 Access https download felicitysolar com using the mobile phone browser and download the latest installation package Method 2 Scan the following QR code and download the latest installation package...

Страница 22: ...rcurrent fault 23 Battery 1 is reversed check the battery wiring 24 Battery 1 reverse connection fault Battery 2 reverse connection fault 25 Battery 2 is reversed check the battery wiring Battery 1 SO...

Страница 23: ...Protection PV String Input Reverse Polarity Protection Battery Input Lightning Protection Battery Input Reverse Polarity Protection Insulation Resistor Detection Residual Current Monitoring Unit Outpu...

Отзывы: