Metal core drilling
Assembly
C-SC_CSSM
Version 1.0
23.01.2019
Page
73
of
75
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
9.3.9
Fitting the protective hose
7.
Position the cover (
1
).
8.
Screw in the three screws (
2
) [1.8 Nm].
9.
Position the bolt (
3
).
10.
Position the protective hose (
4
).
11.
Connect all cables as shown in the connection diagram.
12.
Position the cover (
5
).
13.
Screw in the five screws (
6
) [2.0 Nm].
1
2
4
6
5
3