background image

2X3M MEDIUM CAGE

CAGE 2M

PART LIST DIMENSION

QUANTITY

NO. 1

997MM

4

Box - 1

NO. 1a

999MM

4

Box - 1

NO. 2

997MM

2

Box - 1

NO. 2a

999MM

2

Box - 1

NO. 3

1080MM

4

Box - 1

NO. 4

1128MM

4

Box - 1

NO. 5

1263MM

4

Box - 1

NO. 6

775MM

4

Box - 1

NO. 7

1170MM

8

Box - 1

NO. 8

425MM

1

Box - 2

NO.9

1000MM

1

Box - 2

NO.10

1000MM

1

Box - 2

Page 1 of 7

Содержание 2X3M MEDIUM CAGE

Страница 1: ...ITY NO 1 997MM 4 Box 1 NO 1a 999MM 4 Box 1 NO 2 997MM 2 Box 1 NO 2a 999MM 2 Box 1 NO 3 1080MM 4 Box 1 NO 4 1128MM 4 Box 1 NO 5 1263MM 4 Box 1 NO 6 775MM 4 Box 1 NO 7 1170MM 8 Box 1 NO 8 425MM 1 Box 2 NO 9 1000MM 1 Box 2 NO 10 1000MM 1 Box 2 Page 1 of 7 ...

Страница 2: ...2 CONNECTER AND ACCESSORIE SHEET NUMBER QUANTITY 14 8 Box 1 17 4 Box 1 18 4 Box 1 24 Box 2 16 Box 2 WIRE MESH DIMENSIONS 1 1X13M 2 Box 2 CABLE TIE 1X20M Box 2 ROOF COVER AND ACCESSORY Following parts are for the optional cover ROOF COVER 1 26 Roof support Bar 1 BOX 1 Page 2 of 7 ...

Страница 3: ...We advise having cable ties available to help keep wire mesh in place when you are fitting it Page 3 of 7 ...

Страница 4: ...USTRATION STEP I The roof components are to be built first poles 1 and 1a make up the sides with poles 4 and 5 making up the front and back Lay all roof parts on the floor and connect like below with part 14 Page 4 of 7 ...

Страница 5: ...n the end of each leg STEP III Repeat step II lift up and install the other legs STEP IV Create ground frame Install ground tubes as below illustration once completed the bracing bars part 7 can be fixed from each leg see complete picture on page 3 for positioning Page 5 of 7 ...

Страница 6: ... the frame and from underneath the frame in line with holes on tube 5 screw tube 8 in the same way STEPVI Link the net as below illustration and put cover on last Cable tie the sections of mesh to the frame before cutting to size The long wire threads can be used to lace over lapping parts of the mesh together or further secure the mesh to the edges of the frame Page 6of 7 ...

Страница 7: ...mesh must be pulled as tightly as possible across the top and secured around the top edge with cable ties This will stop any give in the mesh and stop water building up on the cover which may cause damage to the cover or supporting poles Where the mesh overlaps this should also be fixed together at the tightest point with cable ties to stop water being able to build up Page 7of 7 ...

Отзывы: