OPERATION
PUSHOUT PANEL OPERATION DURING PACKING
TELESCOPIC PUSH OUT
The 2R-III telescopic pushout cylinder will normally move
toward the front of the body automatically. When the
resistance circuit is adjusted to produce maximum load
density, it may become necessary to manually retract
the telescopic pushout cylinder in order to allow the com-
pacted refuse to move forward in the body. Also, if the
packer panel stops short of the “home” position, the car-
rier panel operating lever may need to be held (overrid-
den) to allow the refuse to move the pushout panel to-
ward the front of the body. When the pushout panel has
reached the front of the body, neither the packer panel
operating lever nor the carrier panel lever should be over-
ridden except to clear the final hopper load.
DISCONNECTING THE CONTAINER
Once the container is empty, it should be lowered to the
ground, the latch arms released and the cable discon-
nected.
DISCONNECTED
3-16
SECTION 3
ENGINE SPEED UP
BUTTON
PUSHOUT LEVER
Содержание LEACH 2R-III
Страница 2: ......
Страница 8: ......
Страница 15: ...SAFETY PRECAUTIONS DECAL PLACEMENT SECTION 1 2 1 3 4 5 1 2 3 4 5 CART TIPPER CONTROL DOWN UP DOWN UP 1 7 ...
Страница 26: ...SECTION 2 2 8 ...
Страница 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Страница 46: ...SECTION 3 3 20 ...
Страница 54: ...SECTION 4 4 8 ...
Страница 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Страница 62: ...SECTION 6 6 6 ...
Страница 76: ...SECTION 7 7 10 ...