Installation and Maintenance Instructions
Model G-LED Global Series LED Beacon
19
7. Place the cover on the housing and tighten it by turning it clockwise. To
ensure O-ring compression, the cover must be fully seated against the
housing when the threads are tightened.
8. Turn the M3 set screw against the housing until the screw contacts the
housing.
9. Reconnect power to the beacon.
10. Test the beacon by applying power and verifying the pattern.
Figure 9 Location of DIP switch for flash patterns
STEADY ON (DEFAULT)
Figure 10 Switch settings for flash patterns
Strobe Simulation
Steady On
Blink (60 SPM)
Swell (60 SPM)
ON
ON
ON
ON
1 2 3
1 2 3
1 2 3
1 2 3
Rotate
Counterclockwise
Rotate Clockwise
Waggle
Pinwheel
ON
ON
ON
ON
1 2 3
1 2 3
1 2 3
1 2 3