
MSD
TM
Series
© Copyright 2018 Fluid Equipment Development Company | www.fedco-usa.com
-
62
-
Service Policy Continued
Start-Up Record
□
1.
Flexible coupling set screws tightened.
□
2. Motor adapter guards installed.
□
3. All anchor bolts tightened to specifications.
□
4. All pipe couplings tightened to specifications.
□
5. Motor rotational direction correct.
□
6. Motor lubricated to manufacturers specifications.
□
7. Alignment bushing (if present) removed.
□
8.
Final Pump Alignment
performed.
□
9. Inlet pressure indicator installed.
□
10. Inlet pressure switch (if applicable) installed.
□
11. Outlet pressure indicator installed.
□
12. System pipes are clean and upstream filtration in place.
□
13. System leak checked and all air vented from system.
□
14. ALL safety devices in place.
Installation and Start-up Information
Start-up Date: _________________________ Model #: _______________________________
Serial #: ______________________________ Installation Date:_________________________
Installed By: ___________________________
Operating Conditions
Feed Flow: ____________________________ Suction Pressure to Pump:_________________
Discharge Pressure: _____________________
Drain flow rate (high inlet pressure option only): _________________________
VFD frequency (Hz) if used ________________ Voltage and Hz of power supply_____________
VFD Amps: ____________ VFD Amps (after 48 hours of running time): ____________________
Baseline vibration reading at pump start-up (optional): ____________
Pump Alignment Measurements
Motor adapter gap A: __________, B: __________, C: __________, D: __________
Distance between pump and motor shafts (dropout coupling only): __________
Pipe Connection(s)
□
Victaulic connection
□
Flanged connection: Flange Pipe Size (Inlet) __________, Gap __________
Flange Pipe Size (Discharge) __________, Gap __________
General Notes:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
This report has been filled out by: __________________________________Date: ___________