Repair Kits
1
⁄
2
"- 2" (15-50mm)
Ordering COde
MOdeL
Size
in
mm
Check Kits
0710590
RK 767FR CK
1
⁄
2
,
3
⁄
4
15, 20
0710591
RK 767FR CK
1
25
0710592
RK 767FR CK
1
1
⁄
4
- 2
32 - 50
Kits consist of:
Check disc assembly (disc & disc holder). Bonnet 0-ring and Check Spring.
Vent Float Kits
0710593
RK 767FR V
1
⁄
2
,
3
⁄
4
15, 20
0710594
RK 767FR V
1
25
0710595
RK 767FR V
1
1
⁄
4
- 2
32 - 50
Kits consist of:
Float vent disc assembly (vent float, seal & spring) and Bonnet 0-ring.
Bonnet Assembly Kits
0710596
RK 767FR B
1
⁄
2
,
3
⁄
4
15, 20
0710597
RK 767FR B
1
25
0710598
RK 767FR B
1
1
⁄
4
- 2
32 - 50
Kits consist of:
Bonnet, Bonnet O-ring, Vent spring, hood & hood screws.
Rubber Parts Kits
0710599
RK 767FR RT
1
⁄
2
,
3
⁄
4
15, 20
0710600
RK 767FR RT
1
25
0710601
RK 767FR RT
1
1
⁄
4
- 2
32 -50
Kits consist of:
Vent disc, Check disc and Bonnet O-ring.
Seat Kits
0710602
RK 767FR S
1
⁄
2
,
3
⁄
4
15, 20
0710603
RK 767FR S
1
25
0710604
RK 767FR S
1
1
⁄
4
- 2
32 - 50
Kits consists of:
Seat, Seat O-ring and Bonnet O-ring.
FEBCO reserves the right to change or modify product design, construc-
tion, specifications, or materials without prior notice and without incurring
any obligation to make such changes and modifications on FEBCO prod-
ucts previously or subsequently sold.
Freeze Protection Guidelines
Purging of a PVB Assembly with Pressurized Air
1. Close main shutoff valve.
2. Open upstream drain, test cocks and isolation ball valves
to depressurize line.
3. Purge with pressurized line.
4. Leave test cocks and isolation ball valve handles in 45°
angle to drain ball valves and prevent casting damage.
Outlet drain
Valve
Main Shutoff Valve
Upstream (inlet) drain
Flow
Valve Pit
12" Minimum Clearance
Above the Highlest Point of
downstream Piping
Sprinkler System
Piping
zone Control
Servicing the Vacuum Breakers
Internal parts can be removed, repaired or inspected without removing the
valve from the piping.
Disassembly
1. Shut off the supply pressure and drain the valve.
2. Remove the two hood screws and the hood.
3. Place a wrench on the parallel flats of bonnet and stem assembly.
Turn counter clockwise and remove.
4. Remove the vent assembly.
5. Press down on the spring retainer and disengage it from the
retaining lugs. Then turn 90° and remove.
6. Remove the spring retainer and spring. Note that the large
diameter of the spring is down on the guide assembly.
7. Remove the check disc holder and guide assembly.
8. Disassemble the check disc holder assembly.
Reassembly
Reassemble in the reverse order utilizing the new parts from the repair kit.
Installation Instructions
Using FPHB-1 Hydrant
Note:
PVB's must be installed a minimum of 12" (300mm) above
the highest point of water in the sprinkler system.
Water Supply
FPHB-1 with FeBCO
767Fr Series
To Sprinklers
drain Port or Blow down
767FR/LF767FR
1"-2"
(25-50mm)
767FR/LF767FR
1
/
2
",
3
/
4
"
(15, 20mm)
USA: 4381 N. Brawley • Ste. 102 • Fresno, CA • 93722 • Tel. (559) 441-5300 • Fax: (559) 441-5301 • www.FEBCOonline.com
Canada: 5435 North Service Rd. • Burlington, ONT. • L7L 5H7 • Tel. (905) 332-4090 • Fax: (905) 332-7068 • www.FEBCOonline.ca
RP/IS-F-767FR 1006
EDP# 1915947
© 2010 FEBCO
A Watts Water Technologies Company