ELI121-CRW
User’s Manual
12/27/2016
Copyright ©2016,
Future Designs, Inc.
Page
8
of
11
To verify that the ELI121-CRW unit is correctly powered you may check the 12VDC input with a
Fluke meter or scope by probing the +12V and GND contacts shown below. Please verify that the
12VDC is present, is within the +/- 5% tolerance and is free from excessive noise or AC ripple.
Figure 4. ELI121-CRW Power Test Points
Extended Display Information Data (EDID)
ELI uses Extended Display Identification Data (EDID) for automatic configuration with many
operating systems. You can find out more on our website at
http://www.teamfdi.com/edid/
.
12V Test
Point
3.3V Test
Point
3.3V LCD
Test Point
Ground