DETAILED ILLUSTRATION

    

corporate

t

   800.900.1730

f

   630.889.8106

    3609 Swenson Ave.
    St. Charles, IL 60174

2458893

POURED CONCRETE INSTALLATION

Back Box Conduit Entry____

Foam Block Insert to

Retain Back Box Form

Splatter Shield

Wing Nuts

Threaded Rod

SL2000 Series

Universal Back Box

Concrete Pour Form

(by others)

(4) 3/4” Knockouts -

    (2) on back and
    (1) on each side

Fig 2

Masonry  Mounting  Brackets            

Included w/ Back Box Kit

MOUNTING BRACKETS

BACKBOX

BRICK

Figure 4 (brick wall)

SPLATTER GUARD

Figure 6 (brick wall)

FLUSHED WITH FINISHED SURFACE

Figure 5 (brick wall)

BRICK

SL 2000 SERIES 

BRICK WALL INSTALLATION

SL 2000 series backbox installation in 

brick wall construction (Utility Brick 

shown): 

1. Install the (2) slotted mounting 

brackets provided as shown in Figure 

4, using the (4) 6-32 screws provided. 

2. Adjust the brackets vertically for 

optimal gap spaces between upper 

and lower brick surfaces and back 

housing 

3. Orient fixture housing electrical 

connections as directed on inisde 

label. Failure to do so will result in 

faceplate not installed in the correct 

oreintation (critical STEP for SL2003, 

SL2040, and SL2041 models). 

4. Secure the mounting 

brackets to the top of the brick 

(hardware by others) so that the 

front face of the back box will 

be flush or slightly in front of the 

finished wall surface after 

installation (see Figure 5). 

5. Connect conduit to backbox using 

3/4” NPT fitting with teflon tape on 

conduit. Pull wires into back housing for 

electrical connections to be made 

later. 

6. Install Internal support block and 

splatter guard provided as shown in 

Figure 6, using the (2) 8-32 screws 

provided securely and finish wall.   

7. Before continuing, remove splatter 

guard and debris from backbox to 

allow for proper fitment. 

FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW

Orient Back Box As Shown

Proper
Orientation
Position

Back Box Face Flush to Concrete_    

Back Box Face Flush to Composite    

Fig 4

Fig 3

GENERAL

:

1.  Before starting the installation, make sure all electricity has 

been turned off and electrical breaker has been locked out 
and tagged out.

2.  To ensure the success of the installation, be sure to read 

these instructions and review the diagrams thoroughly 
before beginning.

3.  All electrical connections must be in accordance with local 

codes, ordinances, or the National Electrical Code.

NOTE

: The important safeguards and instructions appearing in 

this manual are not meant to cover all possible conditions and 
situations that may occur. 

IMPORTANT: 

Temporarily remove Splatter Shield and contents 

from Back Box housing and set aside.

1.  Install the (2) Threaded Rods provided in through the 

Splatter Shield and to the Back Box as shown. 

Fig 1

 

2.  Ensure that face of Back Box is flush with face of finished 

surface. Connect conduit to backbox using 3/4” K.O.s. 

Fig 2

 

Orient Back Box in proper position as shown.

NOTE

: Ensure front of Back Box is flush with finished wall face.

2.  Reinstall the Splatter Shield and contents into the Back Box 

and allow Threaded Rods to pass through the Pour Form. 
Fasten the Back Box assembly to the Pour Form using (2) 
Wing Nuts provided on the already installed Threaded Rods. 
Refer to 

Fig 3.

 

4.  For additional Composite or Topcoat finish, again ensure 

front of Back Box is flush with finished wall face. 

Fig 4

IMPORTANT

:  All wiring connections must be made in 

accordance with local electrical codes, ordinances, and the 
National Electric Code.

Figure 7 (concrete pour)

INTERNAL SUPPORT  BLOCK

SPLATTER GUARD

WING NUTS

THREADED ROD

Figure 8 (concrete pour)

POUR FORM

SL 2000 SERIES 

POURED CONCRETE INSTALLATION

SL 2000 series backbox 

installation in poured 

concrete construction: 

1. Install the (2) threaded 

rod provided as shown in 

Figure 7, using the (2) 8-32 

x 2" long rods provided. 

2. Attach assembly to 

pour form ensuring the 

Orientation of the 

backbox housing 

electrical connections is 

followed per inside label 

instructions. Failure to do 

so will result in faceplate 

not installed in the correct 

oreintation (critical STEP 

for SL2003, SL2040, and 

SL2041 models). 

FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW

Proper Orientation

Position

Fig 1

Figure 7 (concrete pour)

INTERNAL SUPPORT  BLOCK

SPLATTER GUARD

WING NUTS

THREADED ROD

Figure 8 (concrete pour)

POUR FORM

SL 2000 SERIES 

POURED CONCRETE INSTALLATION

SL 2000 series backbox 

installation in poured 

concrete construction: 

1. Install the (2) threaded 

rod provided as shown in 

Figure 7, using the (2) 8-32 

x 2" long rods provided. 

2. Attach assembly to 

pour form ensuring the 

Orientation of the 

backbox housing 

electrical connections is 

followed per inside label 

instructions. Failure to do 

so will result in faceplate 

not installed in the correct 

oreintation (critical STEP 

for SL2003, SL2040, and 

SL2041 models). 

FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW

Finished Wall

Surface

Align housing to 

face of finished wall

Align housing to 

face of finished wall

Finished Wall 

Surface

Concrete, Block
or Brick Structure

Stucco or other
surface topcoat

18 AWG Anti-wicking Cable

Waterproof Wire Nuts (3) Included

IP68 Rated Sealed

Optical/Driver Unit

Hanger Bar Thru KO

Horizontal & Vertical

6-32 Threaded

Inserts for

Mounting Brackets

(4) Ø 3/4” KO

(Ø 1-1/8 True Size)

(2 in back & 1 @ each end)

TRS

Tamper Resistant

Screw (Optional)

Содержание FCSL2000 Series

Страница 1: ...rews so that the front face of the backbox will be flush or slightly in front of the finished wall surface after installation see Figure 2 3 Orient fixture housing electrical connections as directed on inisde label Failure to do so will result in faceplate not installed in the correct oreintation critical STEP for SL2003 SL2040 and SL2041 models 4 Secure the mounting brackets to wood or metal stud...

Страница 2: ...r guard provided as shown in Figure 6 using the 2 8 32 screws provided securely and finish wall 7 Before continuing remove splatter guard and debris from backbox to allow for proper fitment FILE NAME SL 2000 SERIES INSTALLATION INSTRUCTIONS SLDDRW Fig 2 Orient Back Box As Shown 6 32 adjusment screws provided MOUNTING BRACKETS BACKBOX BRICK Figure 4 brick wall SPLATTER GUARD Figure 6 brick wall FLU...

Страница 3: ...uards and instructions appearing in this manual are not meant to cover all possible conditions and situations that may occur IMPORTANT Temporarily remove Splatter Shield and contents from Back Box housing and set aside 1 Install the 2 Threaded Rods provided in through the Splatter Shield and to the Back Box as shown Fig 1 2 Ensure that face of Back Box is flush with face of finished surface Connec...

Страница 4: ...e Assembly Snap In Capture Right Side Left Side Universal Back Box Top Fixture Wiring Out Snap In Lead Fig 1 Back Box Splatter Shield____ Distance recessed X Snap In Lead Snap In Capture Wall surface Wall surface Added Shims to equal X X Torx screws w pin finished to complement faceplate finish Optional Tamper Resistant Screws TRS Tamper Resistant Torx Screws TR20 w Pin Shims provided to compensat...

Отзывы: