CONFIDENTIAL
THIS DOCUMENT IS THE PROPRIETARY PROPERTY OF FC LIGHTING, INC. ANY UNAUTHORIZED TRANSFER, USE OR REPRODUCTION IS STRICTLY PROHIBITED.
© FC LIGHTING, INC.
FCSL2000 Series
- INSTALLATION INSTRUCTIONS
CAUTION: BEFORE CONNECTING THE FIXTURE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF.
DETAILED ILLUSTRATION
corporate
t
800.900.1730
f
630.889.8106
3609 Swenson Ave.
St. Charles, IL 60174
2458893
POURED CONCRETE INSTALLATION
Back Box Conduit Entry____
Foam Block Insert to
Retain Back Box Form
Splatter Shield
Wing Nuts
Threaded Rod
SL2000 Series
Universal Back Box
Concrete Pour Form
(by others)
(4) 3/4” Knockouts -
(2) on back and
(1) on each side
Fig 2
Masonry Mounting Brackets
Included w/ Back Box Kit
MOUNTING BRACKETS
BACKBOX
BRICK
Figure 4 (brick wall)
SPLATTER GUARD
Figure 6 (brick wall)
FLUSHED WITH FINISHED SURFACE
Figure 5 (brick wall)
BRICK
SL 2000 SERIES
BRICK WALL INSTALLATION
SL 2000 series backbox installation in
brick wall construction (Utility Brick
shown):
1. Install the (2) slotted mounting
brackets provided as shown in Figure
4, using the (4) 6-32 screws provided.
2. Adjust the brackets vertically for
optimal gap spaces between upper
and lower brick surfaces and back
housing
3. Orient fixture housing electrical
connections as directed on inisde
label. Failure to do so will result in
faceplate not installed in the correct
oreintation (critical STEP for SL2003,
SL2040, and SL2041 models).
4. Secure the mounting
brackets to the top of the brick
(hardware by others) so that the
front face of the back box will
be flush or slightly in front of the
finished wall surface after
installation (see Figure 5).
5. Connect conduit to backbox using
3/4” NPT fitting with teflon tape on
conduit. Pull wires into back housing for
electrical connections to be made
later.
6. Install Internal support block and
splatter guard provided as shown in
Figure 6, using the (2) 8-32 screws
provided securely and finish wall.
7. Before continuing, remove splatter
guard and debris from backbox to
allow for proper fitment.
FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW
Orient Back Box As Shown
Proper
Orientation
Position
Back Box Face Flush to Concrete_
Back Box Face Flush to Composite
Fig 4
Fig 3
GENERAL
:
1. Before starting the installation, make sure all electricity has
been turned off and electrical breaker has been locked out
and tagged out.
2. To ensure the success of the installation, be sure to read
these instructions and review the diagrams thoroughly
before beginning.
3. All electrical connections must be in accordance with local
codes, ordinances, or the National Electrical Code.
NOTE
: The important safeguards and instructions appearing in
this manual are not meant to cover all possible conditions and
situations that may occur.
IMPORTANT:
Temporarily remove Splatter Shield and contents
from Back Box housing and set aside.
1. Install the (2) Threaded Rods provided in through the
Splatter Shield and to the Back Box as shown.
Fig 1
2. Ensure that face of Back Box is flush with face of finished
surface. Connect conduit to backbox using 3/4” K.O.s.
Fig 2
Orient Back Box in proper position as shown.
NOTE
: Ensure front of Back Box is flush with finished wall face.
2. Reinstall the Splatter Shield and contents into the Back Box
and allow Threaded Rods to pass through the Pour Form.
Fasten the Back Box assembly to the Pour Form using (2)
Wing Nuts provided on the already installed Threaded Rods.
Refer to
Fig 3.
4. For additional Composite or Topcoat finish, again ensure
front of Back Box is flush with finished wall face.
Fig 4
IMPORTANT
: All wiring connections must be made in
accordance with local electrical codes, ordinances, and the
National Electric Code.
Figure 7 (concrete pour)
INTERNAL SUPPORT BLOCK
SPLATTER GUARD
WING NUTS
THREADED ROD
Figure 8 (concrete pour)
POUR FORM
SL 2000 SERIES
POURED CONCRETE INSTALLATION
SL 2000 series backbox
installation in poured
concrete construction:
1. Install the (2) threaded
rod provided as shown in
Figure 7, using the (2) 8-32
x 2" long rods provided.
2. Attach assembly to
pour form ensuring the
Orientation of the
backbox housing
electrical connections is
followed per inside label
instructions. Failure to do
so will result in faceplate
not installed in the correct
oreintation (critical STEP
for SL2003, SL2040, and
SL2041 models).
FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW
Proper Orientation
Position
Fig 1
Figure 7 (concrete pour)
INTERNAL SUPPORT BLOCK
SPLATTER GUARD
WING NUTS
THREADED ROD
Figure 8 (concrete pour)
POUR FORM
SL 2000 SERIES
POURED CONCRETE INSTALLATION
SL 2000 series backbox
installation in poured
concrete construction:
1. Install the (2) threaded
rod provided as shown in
Figure 7, using the (2) 8-32
x 2" long rods provided.
2. Attach assembly to
pour form ensuring the
Orientation of the
backbox housing
electrical connections is
followed per inside label
instructions. Failure to do
so will result in faceplate
not installed in the correct
oreintation (critical STEP
for SL2003, SL2040, and
SL2041 models).
FILE NAME: SL 2000 SERIES INSTALLATION INSTRUCTIONS.SLDDRW
Finished Wall
Surface
Align housing to
face of finished wall
Align housing to
face of finished wall
Finished Wall
Surface
Concrete, Block
or Brick Structure
Stucco or other
surface topcoat
18 AWG Anti-wicking Cable
Waterproof Wire Nuts (3) Included
IP68 Rated Sealed
Optical/Driver Unit
Hanger Bar Thru KO
Horizontal & Vertical
6-32 Threaded
Inserts for
Mounting Brackets
(4) Ø 3/4” KO
(Ø 1-1/8 True Size)
(2 in back & 1 @ each end)
TRS
Tamper Resistant
Screw (Optional)