
1. Validate the setups matches 56X Setup Requirements
2. Perform visual inspections for leaks
3. Load All Defaults
4. Fill barrel with CO
2
until tank pressure reaches to 10 psig, then purge barrel until tank
pressure is at 0 psig. Repeat this process for 3 times to empty out the air.
5. Press the
“FILL” & “Beater” button to fill barrel. Fill barrel to just below the “Relief Vent
Valve
”.
NOTE: In the filling process, motor will need to be stopped to check
filling level, and relief vent valve will be pulled to allow filling
6. Press the
“OFF”, the “Defrost” then the “Run” button.
7. Verify and/or update the Time, Date, DL Savings (where applicable), Wake/Sleep Time
and Defrost Times.
8. After freeze down, pour several 12oz cups to check product quality.
Initial Start-Up and Freeze
50
Содержание 56 Series
Страница 6: ...The Four Ingredients The four ingredients to Produce a Frozen Beverage Water Syrup CO2 Electricity 6 ...
Страница 9: ...Complete Header Assembly 9 Water Tank Syrup Tank Syrup Regulated CO2 ...
Страница 19: ...P MAX DIAGNOSTIC FLOW CHART 19 ...
Страница 20: ...Product Dispensing Valves DDV Valve ADA DDV Valve SDV Valve 20 ...
Страница 31: ...31 562 563 Electrical Diagram ...
Страница 32: ...32 564 Electrical Diagram ...
Страница 51: ...Status Lights 51 Annunciator Pad Sold Out Light ...
Страница 55: ...Remote Condenser 55 ...
Страница 57: ...57 Remote Condenser Layout ...
Страница 58: ...Remote Trap Layout 58 ...
Страница 59: ...Remote Refrigerant Charge Matrix Heatcraft remote condenser FBD remote condenser 59 ...
Страница 60: ...Product Warranty 60 ...
Страница 63: ...63 ALL RETURNED PARTS MUST HAVE AN RGA AND A COMPLETED WARRANTY CLAIM FORM Product Warranty ...
Страница 64: ...Thank you 64 ...