3.1 Basic prerequisites
3.1.1 General
This machine has been built in compliance with the latest technical
standard and complies with the applicable regulations and tech-
nical rules.
However, dangers for persons and property may arise from this
machine, if:
n
it is used for purposes other than the ones it is intended for,
n
it is operated by untrained personnel,
n
it is changed or converted in an unprofessional way,
n
the safety instructions are not observed.
Each person involved in the operation, maintenance and repair of
the machine must therefore read and comply with these safety reg-
ulations. If necessary, the operating company must obtain the rele-
vant signatures as confirmation.
Furthermore, the following obviously also applies:
n
applicable accident prevention instructions,
n
generally accepted safety and road traffic regulations,
n
country/state specific safety regulations.
It is the duty of the operator to be acquainted with the safety regu-
lations and to apply these accordingly. This also applies for local
regulations and regulations concerning different types of handling
activities. Should the recommendations in these instructions be dif-
ferent from the regulations valid in your country, you must comply
with the safety regulations valid in your country.
3.1.2 Explanation of signal words used:
DANGER!
Danger to life if failing to comply!
Sections marked accordingly indicate an extremely
dangerous situation that could lead to fatal or
severe injuries, if this warning is disregarded.
WARNING!
Danger to life or danger of severe injuries if
failing to comply!
Sections marked accordingly indicate a dangerous
situation that could lead to fatal or severe injuries,
if this warning is disregarded.
Concerning your safety – Basic prerequisites
DR7X
16
Содержание Dynapac DR7X
Страница 2: ...2 ...
Страница 6: ...Table of contents DR7X 6 ...
Страница 7: ...1 Introduction Introduction DR7X 7 ...
Страница 11: ...2 Technical data Technical data DR7X 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DR7X 15 ...
Страница 37: ...4 Indicators and control elements Indicators and control elements DR7X 37 ...
Страница 39: ...5 Checks prior to start up Checks prior to start up DR7X 39 ...
Страница 45: ...6 Operation Operation DR7X 45 ...
Страница 56: ...Operation Operating hour meter engine rpm meter DR7X 56 ...
Страница 57: ...7 Loading transporting the machine Loading transporting the machine DR7X 57 ...
Страница 61: ...8 Maintenance Maintenance DR7X 61 ...
Страница 96: ...Maintenance As required DR7X 96 ...
Страница 97: ...9 Setting up refitting Setting up refitting DR7X 97 ...
Страница 99: ...10 Troubleshooting Troubleshooting DR7X 99 ...
Страница 106: ...Troubleshooting What to do if the engine has flooded DR7X 106 ...
Страница 107: ...11 Disposal Disposal DR7X 107 ...
Страница 109: ......
Страница 110: ......