Maintenance - 2000h
4812159001_I.pdf
2019-11-05
Rear axle differential - Oil change
Fig. Rear axle, underside
1. Level/Filler plugs (x 3)
2. Drain plugs (x 3)
3. Filler plugs (x x)
3
1
2
2
Never work under the roller when the engine is
running. Park on a level surface. Block the wheels
securely.
Never work under the roller when the engine is
running. Park on a level surface. Block the wheels
securely.
Wipe clean and remove the three level/filler plugs (1)
and (3) and all three drain plugs (2). The level/filler
plugs are located on the front and rear of the axle, and
the drain plugs are located on the underside and rear.
Drain the oil into a container. The volume is approx.
12.5 litres (13.2 qts).
Deliver the drain oil to environmentally correct
handling.
Deliver the drain oil to environmentally correct
handling.
Refit the drainage plugs and top up with fresh oil until
the correct level is reached. Refit the level/filler plugs.
Use transmission oil, see Lubricant Specification.
Drum gearbox - Oil change
Fig. Drum gearbox
1. Drain plug
2. Filler plug
3. Level plug
1
2
3
Wipe clean, unscrew the plugs (1, 2 and 3) and drain
the oil into a suitable receptacle, capacity about 5.0
liters (5,3 qts.).
Refit the drain plug (1) and fill with oil up to the level
plug (3), according to "Drum gearbox - Checking the
oil level".
Use transmission oil according to the lubricant
specification.
Clean and refit the level plug (3) and filler plug (2).
149
Содержание DYNAPAC CA2800
Страница 2: ......
Страница 12: ...e 4812159001_I pdf 2019 11 05...
Страница 16: ...Introduction 4812159001_I pdf 2019 11 05 4...
Страница 22: ...Safety Optional 4812159001_I pdf 2019 11 05 10...
Страница 26: ...Special instructions 4812159001_I pdf 2019 11 05 14...
Страница 70: ...Machine description 4812159001_I pdf 2019 11 05 58...
Страница 90: ...Operation 4812159001_I pdf 2019 11 05 78...
Страница 102: ...Operating instructions Summary 4812159001_I pdf 2019 11 05 90...
Страница 104: ...Preventive maintenance 4812159001_I pdf 2019 11 05 92...
Страница 114: ...Maintenance Maintenance schedule 4812159001_I pdf 2019 11 05 Service Checklist 102...
Страница 120: ...Maintenance 10h 4812159001_I pdf 2019 11 05 108...
Страница 126: ...Maintenance first 50h 4812159001_I pdf 2019 11 05 114...
Страница 128: ...Maintenance 50h 4812159001_I pdf 2019 11 05 116...
Страница 169: ......
Страница 170: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...