Maintenance measures - 250 h
4812159001_I.pdf
2019-11-05
Maintenance measures - 250 h
Every 250/750/1250/1750..... hours of operation (every
3 months)
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Drum cartridge - Checking the oil level
Fig. Left drum side
1. Groove
1
Position the roller on a flat surface with the groove (1)
on the inside of the drum aligned with the top of the
drum frame.
Fig. Left drum side
1. Filler plug
2. Drain plug
3. Sight glass
1
2
3
The oil should now come up to the sight glass (3).
If necessary, release the filler plug (1) and fill to half
the sight glass (3).
Clean the magnetic filler plug (1) of any metallic
residue, before refitting the plug.
Ensure that only Dynapac Drum Oil 1000 is used
in the cartridges.
Ensure that only Dynapac Drum Oil 1000 is used
in the cartridges.
Do not overfill with oil - risk for overheating.
Do not overfill with oil - risk for overheating.
Now repeat the procedure on the opposite side of the
drum.
117
Содержание DYNAPAC CA2800
Страница 2: ......
Страница 12: ...e 4812159001_I pdf 2019 11 05...
Страница 16: ...Introduction 4812159001_I pdf 2019 11 05 4...
Страница 22: ...Safety Optional 4812159001_I pdf 2019 11 05 10...
Страница 26: ...Special instructions 4812159001_I pdf 2019 11 05 14...
Страница 70: ...Machine description 4812159001_I pdf 2019 11 05 58...
Страница 90: ...Operation 4812159001_I pdf 2019 11 05 78...
Страница 102: ...Operating instructions Summary 4812159001_I pdf 2019 11 05 90...
Страница 104: ...Preventive maintenance 4812159001_I pdf 2019 11 05 92...
Страница 114: ...Maintenance Maintenance schedule 4812159001_I pdf 2019 11 05 Service Checklist 102...
Страница 120: ...Maintenance 10h 4812159001_I pdf 2019 11 05 108...
Страница 126: ...Maintenance first 50h 4812159001_I pdf 2019 11 05 114...
Страница 128: ...Maintenance 50h 4812159001_I pdf 2019 11 05 116...
Страница 169: ......
Страница 170: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...