Maintenance every 6 months
BOMAG
47
BP 12/40, BP 20/50, BP 25/50
Tightening the V-belt
Fig. 46
l
Pull the engin carrier back (Fig. 46) until the
correct V-belt tension is achieved and tighten
the four fastening screws.
l
Assemble the V-belt guard.
!
Caution
Check the V-belt tension again after a running
time of approx. 25 operating hours, retighten if
necessary.
5.17 Checking the Rubber Buff-
ers
Fig. 47
l
Check the condition and tight fit of all rubber
buffers and exchange if necessary (Fig. 47) .
Go
to
Discount-Equipment.com
to
order
your
parts