![Fayat Group BOMAG BP 12/40 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/fayat-group/bomag-bp-12-40/bomag-bp-12-40_operating-instructions-manual_3696886019.webp)
Operation
BOMAG
20
BP 12/40, BP 20/50, BP 25/50
4.1
General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter 3 “Indicators
and control elements” before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
4.2
Tests before taking into op-
eration
!
Danger
Loss of hearing!
Wear your personal noise protection means
(ear defenders) before starting operation.
Strictly observe the safety regulations.
Refer also to the detailed description in the
maintenance instructions.
i
Note
The running in time of the vibratory plate is 25 op-
erating hours.
The following inspections must be carried out be-
fore each working day or before a longer working
period.
l
Park the machine on level ground.
l
Top up missing lubricants according to the
maintenance instructions.
l
Check fuel tank and fuel lines for leaks.
l
Check condition of engine and machine.
l
Check bolted connections for tight fit.
l
Check the engine oil level.
l
Check the fuel level.
l
Check the water level in the sprinkler system
*
.
*
Optional equipment
Go
to
Discount-Equipment.com
to
order
your
parts