manualshive.com logo in svg
background image

V.

 

04

2013

 

Opera

 

A - Firs

 

A
p

p

 

Step 1

 
 

Turn the 

clockwise
power le

 

A
c

 
 

 

 
 

 
 

 
 

 
 

3

 

ation 

t time o

Attention
please en

pag.6) 

1 – SK45

 emergency

e to unlock

d is lighted

Attention
connected

Fast &

operation

n! Before 

nsure the 

50 / SK5

 

 

y stop 

: the 

d-ON. 

n! To prev

d to eithe

 

& Fluid Mana

operating

 frame lo

550 pow

 

Unlock
of the 

machi
power

plugge
The po

The m
machi

the int
Please
should

the ma
switch

one w
conne

vent dama

er 220-24

agement B.V

g your SK

ock was c

wer mana

k the emerg

 machine b

ne is autom

r connector

ed into a 22

ower led lig

machine is in

ne from its

terface but

e note that 

d be no rea

achine. In 

hed off (e.g

way of achie

ctor at the 

age, the S

40V/16A/

V. – SK450 / S

K450 / SK

orrectly r

agemen

gency stop

by turning c

matically sw

r at the rea

20-240V w

ghted-ON. 

n stand-by 

s sleeping m

ttons. 

 during nor

son ever to

case the sh

. for maint

eving this: u

 back of the

SK450 / 

/50Hz po

SK550 

K550 for t

removed 

 button on 

clockwise. T

witched on 

r of the sha

all socket. 

 modus. To

modus, pres

mal operat

o take the p

haker must 

enance) th

unplug the 

e machine.

SK550 m

ower grid

the first t

 (as indic

 the front 

The 

when the 

aker is 

o awake the

ss any of 

tion there 

power off 

t be 

here is only 

 power 

 

may only b

ds. 

P9

time, 

cated in 

 

be 

9

 

Содержание SK450

Страница 1: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P1 FAST FLUID MANAGEMENT SK450 SK550 ENGLISH...

Страница 2: ...Introduction warranty CE certification 3 Main SK450 SK550 components 4 Safety instructions 5 Installation 6 8 Operation 9 12 Maintenance 13 Problem solving 14 15 Service and Support Fuses 15 Specific...

Страница 3: ...conditions referred to in point 6 of the general conditions of sale The warranty obligation described in this article only applies if the goods supplied by F FM have been used in accordance with the m...

Страница 4: ...or ha 10 Shake 11 Can ta 12 Can m 13 Excent 14 Shake 3 SK450 ce Emerg rmer Board able front p ng plate reduction k strut susp andle r frame able ounting rim ter axle r motor d Fast 0 SK5 gency stop pa...

Страница 5: ...should see to it that the machine is kept in good condition Defective components should be replaced 6 In order to prevent physical injury the doors should be closed and the paneling fitted during nor...

Страница 6: ...e unpacking it Take care not to accidentally close the door before finishing installation as it can then only be unlocked power on the machine Step 2 Remove the frame lock Pull out cord to remove fram...

Страница 7: ...el the machine and lock the adjustable feet Tip before locking the adjustable feet start a mixing cycle with a small load 5kg While the SK450 SK550 runs check if all four feet are firmly in contact wi...

Страница 8: ...tep 5 Electrical connection Connect the power cable to the socket at the rear of the machine Ensure the emergency stop is unlocked turn clockwise Attention To prevent damage the SK450 SK550 may only b...

Страница 9: ...22 ower led lig machine is in ne from its terface but e note that d be no rea achine In hed off e g way of achie ctor at the age the S 40V 16A V SK450 S K450 SK orrectly r agemen gency stop by turnin...

Страница 10: ...r of een 0 SK55 us user sett Fluid Mana ement o Place fil prevent during o 50 Cont tings are av agement B V f cans a ler disc on displaceme operation rol inter vailable in V SK450 S and othe lid to e...

Страница 11: ...or is i When th finishes with the SK450 unclamp use the em r pressing nlocking ontainer agement B V 550 he shakin oor If your 0 is fitted w door skip it will close tically later ogram wil nterrupt he...

Страница 12: ...od SK550 the interfa top button a n entering creen will ap 550 s life in l hours ss the prog ough the dif U2 option unlock the d y be necess ure or accid r while the U3 option mp plate to wnwards Th a...

Страница 13: ...le parts especially clamping plate spindles Use diluted detergent only and Teflon spray only Though the SK450 SK550 is designed to be completely maintenance free periodic greasing of moving parts will...

Страница 14: ...n solve a problem yourself or whether you need to call in the Service Department Use the Error chart for error messages from the software interface The tool button means you cannot solve the problem y...

Страница 15: ...ectly set Call service Clamping plate goes down and back up again without mixing Container is too low Use taller container Container is too weak crushed Use stronger container or adjust clamping force...

Страница 16: ...ainboard component overheat 90 Celsius Pause for cooling check machine ventilation If persistent call service E41 EEPROM read error Allow reset to default settings If persistent call service E71 SK550...

Страница 17: ...K450 SK550 Remove mains connector and pull fuse tray outwards The inner fuse is the damaged one to replace the outer is the spare to replace it with Dispose of the burnt fuse and in time remember to g...

Страница 18: ...e variable Product access internal sliding door Shaking speed variable up to 720 rpm Sliding table option Large can table standard Machine size H x W x D 116 x 72 x 61 cm Machine weight empty 180 kg A...

Страница 19: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P19 Electrical wiring diagram...

Страница 20: ...your hands Discarding the Machine Discarded equipment usually still consists of valuable materials For this reason do not simply throw your machine out with the oversized refuse but ask your supplier...

Страница 21: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P21 Fast Fluid 2013 www Fast Fluid com...

Отзывы: