14
ROUTINE MAINTENANCE
DAILY
1)
CHECK THE CABLE OF THE MACHINE BEFORE THE RUNNING.
2)
CHECK THE MACHINE IF THE MACHINE IS CLEAN AND MAINTENANCE IS COMPLETED.
3)
CHECK THE HYDRAULIC CYLINDER AGAINST THE AIR LEAKAGE.
WEEKLY
1)
CHECK IF THE DAILY MAINTENANCE IS DONE SYSTEMATICALLY.
2)
CHECK IF THERE IS ANY OIL LEAKAGE ON THE CYLINDEROF THE BEAD LIFTING.
3)
CHECK IF THERE IS ANY PROBLEM ON THE SWITCHES AND CONNECTION OF THE MACHINE.
MONTHLY
1)
CHECK IF THE DAILY AND WEEKLY MAINTENANCES ARE DONE.
2)
CHECK THE MACHINE PEDALS.
3)
CHECK THE BELT OF THE MOTOR.
4)
CHECK THE CONNECTION OF THE GEARBOX.
5)
CHECK THE MOTOR CONNECTION BOLTS.
6 MONTHLY
1)
CHECK THE DAILY, WEEKLY AND MONTHLY MAINTENANCE ARE DONE.
2)
CHECK IF THERE IS ANY CONNECTION PROBLEMS ON THE CABLES AND SOCKET.
3)
CHECK THE EARTH CONNECTION OF THE MACHINE ELECTRIC SYSTEM.
4)
CHECK THE ADJUSTMENT OF THE DISMANTLING AND FIXING ARM.
YEARLY
1)
CHECK THE DAILY, WEEKLY, MONTHLY AND 6 MONTHLY MAINTENANCE ARE DONE.
2)
ARE THERE ANY UBNORMAL NOISES COMING FROM THE MACHINE.
3)
ARE THERE ANY UBNORMAL NOISES COMING FROM THE ENGINE.
4)
ARE THERE ANY UBNORMAL NOISES FROM THE MACHINE WHEN THE MACHINE IS NOT WORKING BUT
PLUGGED.
5)
IS THERE ANY HEATING IN THE CABLES.
6)
IS THERE ANY UBNORMALITYIN THE ENGINE DURING THE OPERATION.
IF ANY ANSWERS OF THESE GUESTIONS ARE YES CALL THE TECHNICAL SERVICE IMMEDIATELEY DO NOT
TRY TO SOLVE THE PROBLEMS BY YOURSELF.
CLAUSE 11
Содержание RGU300.ECO
Страница 1: ... Automatic Truck Tyre Changer Machine RGU300 ECO INSTRUCTIONS BOOKLET English ...
Страница 15: ...17 DEMONTAGE PLAN CLAUSE 14 ...
Страница 16: ...18 ...
Страница 17: ...19 ...