12
112529 Revision date: 05.13.20
Assembly Instructions
8
Use the photos below to assemble the drain manifold. Read these notes
before you continue.
• A five (5') section of pvc is included to construct this manifold.
• Length of each pvc tube depends on the position of the reservoir and
frame.
• Dry fit all connections before applying pvc primer and pvc cement.
Apply cement only as directed to allow for cover removal.
Do not
cement the short tube that extends from final elbow to reservoir.
This
allows for cover removal and reservoir maintenance.
• Manifold will drain through the hole drilled in the cover–Procedure 6.
• Remove the plugs to periodically clean the drain tube.
ASSEMBLE AND INSTALL DRAIN MANIFOLD
Assemble on the drain tube to set the
correct angle of the manifold back to
the reservoir drain hole.
WF1574
WF6990 PVC Cement &
113372 PVC Purple Primer
WF1384
112603
WF6627
112604
ATTENTION:
Dimensions for tube sections are not provided
to allow for minor adjustments in reservoir position. A five
foot (5') section of pvc tube is included for this manifold.
DRY FIT ALL FITTINGS BEFORE YOU APPLY CEMENT!
Set reservoir in the desired position.
Estimate length of tubes and fit
together.
Dry fit all pieces to get the best fit. Do
not apply cement until all pieces are
cut and ready to slide together.
Cement
Cement
Tube to Reservoir—
Do not cement.
Install WF6627 and 112603
at end of drain tube.
Cement WF6627
to drain tube.
Cement WF1384 to drain
tube. Cement 112604 to
WF1384.
WF1384
112604
No Cement
DRAIN MANIFOLD
PARTS