25
Revision date: 09.20.21
11291950
9
INSTALL THE MAIN PUMP & PLUMBING
Install the Main Pump and Plumbing
Gather parts identified in the photo and construct main pump supply plumbing. Review assembly and installation
notes that follow before you begin. For best results, complete this procedure after setting frame slope.
• Dry fit all connections before applying pvc primer and pvc cement.
• Install the WF1023 Y-filter with the water-flow direction arrow pointing away from the pump.
• Center reservoir so bulkhead fitting points toward the supply manifold end of the frame.
WF1530
From Pump
WF1530
WF2160
WF3310
WF3410
WF1530
WF1023
WF2153
3/4" PVC
3/4" PVC
WF1320 tee
fitting at the
end of the
pvc manifold.
Water Flow
A
WARNING:
All electrical
wiring to be completed
by a qualified electrician
according to recognized
local building codes.
WF1530
water flow
Supply
Manifold
End
1/4"
Nutrient
Tube
1" PVC
3/4" PVC
Drain
Manifold
End
2" Drain
PVC
Reservoir
113536
Pump
113537
Unions
A
Side View of System
Drain
Drain
Bulkhead Fitting &
WF2193 Adapter
NOTE:
Secure
pump to mounting
surface to reduce
vibration.
See A in diagram above.
See A in diagram below.
Содержание Growers Supply HydroCycle 11291950
Страница 31: ...31 Revision date 09 20 21 11291950 Quick Start Guide Sample System Fully Assembled ...
Страница 40: ...40 11291950 Revision date 09 20 21 PAGE RESERVED FOR CUSTOMER NOTES AND RECORDS ...
Страница 41: ...41 Revision date 09 20 21 11291950 PAGE RESERVED FOR CUSTOMER NOTES AND RECORDS ...