GROWSPAN

 GOTHIC PRO GREENHOUSES AND SYSTEMS

Revision date: 06.20.18

5.  Once the main cover is in place and centered, begin at 

the peak of one end and install the wire spring into the 

U-channel to secure the cover. 

 

ATTENTION: 

Center the main cover front to back and 

side-to-side to ensure that enough cover material is 

present to lock into the U-channel. The excess cover 

along each side is rolled up when the roll-up side 

assemblies are installed.

6.  The rope can remain in place to temporarily secure the 

cover. Remove the ropes as the covers are secured to 

the greenhouse.

7.  As the spring is install the spring into the U-channel 

at the top of the first end rafter, ensure that an even 

amount of the cover is exposed and maintained along 

the edge of the greenhouse. 

 

NOTE:

 The cover material is cut longer/wider than 

is required to cover the greenhouse. For easier 

anchoring, allow approximately 10" to extend past the 

edge of the end rafter as the cover is anchored into 

place.

8.  Continue down both edges of the first end rafter until 

the entire length of the end of the main cover film is 

secured in place.

9.  Move to the other end of the building and repeat the 

steps to secure the main cover in the U-channel.

10. After the cover is stretched end-to-end and secured 

using the spring and U-channel, move to one side of 

the greenhouse and repeat the steps to anchor the 

cover film to the first side. 

 

NOTE:

 Begin at one end of the U-channel and work 

toward the other. Another option is to begin at the 

middle of each side and work towards each end. 

Maintain an even length as working along the side. The 

final stretching of the cover will take place when the 

last side is secured.

Photos show installing the spring into the U-channel 

on the outside of the greenhouse. The process is the 

same for the U-channel attached to the top of the end 

rafters.

INSTALL MAIN COVER (continued)

Attach main cover to Poly Latch U-Channel.

11.  After securing the first side, move to the remaining 

side, stretch the cover, and secure it in place. 

 

NOTE: 

Pull the cover tight as the spring is inserted into 

the U-channel.

12. Once the first cover is stretched and secure, install the 

inflation fan kit in the desired location and according to 

the instructions sent with the kit. 

 

Install the Inflation Fan Kit 

before

 installing the second 

main cover. Consult the instructions included with the 

Inflation Fan Kit to install the kit.

Содержание Growers Supply GrowSpan Gothic Pro Series

Страница 1: ...W x 10 H x 20 L 104849 18 W x 10 H x 24 L 104850 18 W x 10 H x 28 L 104851 18 W x 10 H x 32 L 104852 18 W x 10 H x 36 L 2018 Growers Supply All Rights Reserved Reproduction is prohibited without permi...

Страница 2: ...ions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing...

Страница 3: ...rafter pipe In some cases band clamps are also used to connect diagonal struts to the assembled frame Clip or Fabric Clip A short half section piece of conduit cut lengthwise used to secure the end p...

Страница 4: ...Quick Start Guide show exploded views of all critical connections Use the diagrams in the Quick Start section to assemble the frame of your building Consult the remainder of these instructions for imp...

Страница 5: ...212 Fabric Clip FA4482B Tek Screw QH1402 Band Clamp 102548 Cross Connector 104074 Square to Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 103496 Gearbox 104624 Squa...

Страница 6: ...does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 7: ...Purlins Ground Post Frame length may differ from actual frame OVERVIEW This section describes assembling your greenhouse For details please see section Assembling the Gothic Pro Greenhouse Components...

Страница 8: ...round post 6 Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if n...

Страница 9: ...are set onto the ground posts 1 Select the five 5 pipes needed to assemble the first end rafter and arrange on a level surface 2 Slide four 4 end purlin clamps two on each side of the peak over the r...

Страница 10: ...king the purlins ensures that an accurate spacing of the rafter assemblies is achieved and maintained during assembly Gather the Parts Pipe 1 315 x 75 swaged 131S075 Pipe 1 315 x XX plain 131P0XX Mark...

Страница 11: ...Cross connector 102548 5 16 x 2 1 2 machine bolts and 5 16 nuts Lifts ladders and assistants Rope or cable 1 Carefully stand the first end rafter slide a band clamp onto each rafter leg and place the...

Страница 12: ...nter of the rafter to maintain the proper spacing Interior Rafter Align mark with center of rafter Purlin 11 Verify that the rafter spacing is forty eight inches 48 on center adjust as needed and tigh...

Страница 13: ...and is attached at ground level along both sides of the frame It helps keep the ground posts in place and also prevents the frame from working into the ground when anchored Attach the baseboards to t...

Страница 14: ...ponsible for providing a baseboard for this frame If no baseboard is present attach the strut to the ground post using a Tek screw or other customer supplied fasteners 4 Repeat the above steps to atta...

Страница 15: ...iding where to install the additional horizontal framing for accessories Consult the diagrams in the Quick Start section showing the polycarbonate panel locations and the locations of the aluminum tri...

Страница 16: ...he distance between the top of the base tube and band clamp Step 7 to determine the length of the first door jamb NOTE If the measured length is longer than 99 an additional section of square tubing i...

Страница 17: ...r length for the width of the rough door opening 20 Using two angle brackets attach the header tube to the end wall assembly between the door jambs as shown below 21 Verify that both door jambs are pl...

Страница 18: ...ning frame member 26 Choose a square to round tube connect bracket and attach the bracket to one end of the vertical frame member Use a 5 16 drill bit to drill a hole through the tube and attach the b...

Страница 19: ...eight determined by the installation instructions included with that accessory using QH1330 brackets Dashed lines show where additional frame tubes are installed If you are not installing any accessor...

Страница 20: ...nlight will make the film difficult if not impossible to remove During preparation rest the edges of the panels on cardboard or other material to protect them from dirt and damage Seal the bottom edge...

Страница 21: ...r of 4 x 12 panel is used to cover the area along other side of door Always remove protective film and mark and install UV protected side to outside of greenhouse 3 Apply white vent tape to bottom of...

Страница 22: ...ure and cut two sections of H channel to correct length H channel is used to join two separate panels Install H channel with flat side out NOTE Cut panel to proper height after attaching to end wall f...

Страница 23: ...nd prepare a panel as previously described to cover remaining area along door Use the remainder of 4 x 12 panel from Panel A End Cap 104548 H channel Install flat side out Trimmed polycarbonate panel...

Страница 24: ...TTENTION The U channel profile 104213 for top edge of all panels dashed line below is installed last and after all profile is installed along edges and between each panel b Distance between notches is...

Страница 25: ...results Consult the diagram below for clarification 2 Attach one section of the poly latch U channel to the side of the frame using Tek screws Attach U channel flush with the outside edge of the end...

Страница 26: ...or straps near the edge of the material and below where the cover will be secured to the U channel 3 After tying the ropes to the main cover throw the ropes over the top of the greenhouse and pull th...

Страница 27: ...in place 9 Move to the other end of the building and repeat the steps to secure the main cover in the U channel 10 After the cover is stretched end to end and secured using the spring and U channel mo...

Страница 28: ...d to the frame NOTE The number of pipes used in the roll up conduit assembly varies with the length of the greenhouse Roll up conduit assemblies consist of multiple sections of swaged 1 315 pipe at 75...

Страница 29: ...rial to the conduit with Tek screws and fabric clips evenly spaced along the conduit 4 Continue to roll the conduit until the excess cover material is wound around the conduit 5 Repeat these steps for...

Страница 30: ...bearing bracket and attach the bearings as needed In some instances the bearings may come already attached Assemble as follows NOTE Single bearings are attached to the sides of the bracket and double...

Страница 31: ...nt it on the same side of the mounting bracket 14 Finish rolling the cover conduit in a clockwise motion up to the Twist of the Wrist assembly INSTALL ANTI BILLOW ROPES Gather the Parts Eyebolts Anti...

Страница 32: ...no wood baseboard is present as required additional steps must be take to anchor the lower portion of the anti billow ropes 3 Move up the same end rafter and install the second eyebolt through the pol...

Страница 33: ...OUSES AND SYSTEMS Revision date 06 20 18 QUICK START GUIDE 18 Gothic Pro Greenhouse Frame shown may differ in length from actual frame Ground Level Height 18 0 9 6 15 16 Width 3 11 Sidewall Height FRO...

Страница 34: ...5 18G16B Purlin Connection Notes Purlin connected to end rafter using 102856 clamp Purlin connected to mid rafters using 102548 connector Purlin connection See Connection Note Purlin connection See Co...

Страница 35: ...EENHOUSES AND SYSTEMS Revision date 06 20 18 SIDE PROFILE 104848 131S075 131S075 131S075 Purlin Run 131P0255 4 0 on center Rafter Spacing 20 0 Length center to center Customer Supplied Baseboard Custo...

Страница 36: ...HOUSES AND SYSTEMS 36 Revision date 06 20 18 SIDE PROFILE 104849 131S075 131S075 131S075 Purlin Run 131P0735 4 0 on center Rafter Spacing 24 0 Length center to center Customer Supplied Baseboard Custo...

Страница 37: ...OUSES AND SYSTEMS Revision date 06 20 18 SIDE PROFILE 104850 28 0 Length center to center 131S075 131S075 131S075 Purlin Run 131S075 131P0495 4 0 on center Rafter Spacing Customer Supplied Baseboard C...

Страница 38: ...ND SYSTEMS 38 Revision date 06 20 18 32 0 Length 131S075 131S075 131S075 Purlin Run 131S075 131S075 131P0255 center to center 4 0 on center Rafter Spacing SIDE PROFILE 104851 Customer Supplied Baseboa...

Страница 39: ...S AND SYSTEMS Revision date 06 20 18 36 0 Length 131S075 131S075 131S075 Purlin Run 131S075 131S075 131P0735 center to center 4 0 on center Rafter Spacing Customer Supplied Baseboard Customer Supplied...

Страница 40: ...SYSTEMS 40 Revision date 06 20 18 CONNECTIONS Endwall Baserail Connection View 1 Rafter Base Rail Connection View 2 Rafter Endwall Connection View 3 Purlin End Rafter Connection View 4 Purlin Mid Raf...

Страница 41: ...ction View 4 Purlin End Rafter Connection View 2 Rafter Base Rail Connection View 5 Purlin Mid Rafter Connection View 3 Rafter Endwall Connection QH1402 1 66 Band Clamp Endwall Rafter 104074 Sq Rnd Tu...

Страница 42: ...END FRAME DIAGRAM FRONT VIEW 82 1 4 INSDIE DIM 37 5 8 C L C L 21 3 16 C L C L 21 3 16 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END...

Страница 43: ...06 20 18 END FRAME DIAGRAM BACK VIEW 37 5 8 C L C L 21 3 16 C L C L 21 3 16 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TU...

Страница 44: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 45: ...NATE PANELS FRONT VIEW USE 4 X 12 PANEL TO COVER A B H CHANNEL U CHANNEL PANEL A PANEL B 6 X 10 POLY POLY 6 X 10 POLY 4 X 8 END CAP ABOVE DOOR ONLY NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE OUTSI...

Страница 46: ...S AND SYSTEMS 46 Revision date 06 20 18 POLYCARBONATE PANELS BACK VIEW USE 4 X 12 PANEL TO COVER A B H CHANNEL PANEL A PANEL B 6 X 10 POLY POLY 6 X 10 POLY 4 X 12 NOTE INSTALL UV PROTECTED SIDE OF PAN...

Страница 47: ...47 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 20 18 Page reserved for customer notes...

Отзывы: