21
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.06.18 113836_37_38_39R
END PANEL INSTALLATION (continued)
NOTE:
Space FA4484B Tek screws evenly at 16"
on-center when securing panels. DO NOT USE
WASHERS WHEN SECURING H-CHANNEL TO END
FRAME.
DO NOT install profile on bottom of end wall panels.
These edges are sealed with vent tape.
Use an FA4484B Tek screw and washer to secure panel to
end wall frame. Do not crush panel when installing screws.
GLAZING PANEL
8MM POLYCARBONATE
PANEL SPLICE "H" CHANNEL
TEK SCREW
END WALL FRAME TUBE
END WALL FRAME TUBE
TEK SCREW & NEO-BONDED WASHER
Diagram shows basic panel installation and fasteners used
to secure polycarbonte panels.
In photo below, top of panel is removed using a power
tool equipped with a round cutting bit. Use rafter as a
guide for best results.
NOTE:
Actual greenhouse frame may differ.
4. Continue installing panels and aluminum profile in the
locations shown on the end panel diagrams (Quick
Start section) for the front and back end walls.
U-channel profile (104213) is also installed along panel
bottoms
above doors
to finish those edges.
5. Continue installing the polycarbonate panels as
described for the front and back end walls.
ATTENTION:
U-channel profile is installed along the
edges of the panels shown in the diagram below.
Cut upper panel
to proper length.
Frame shown above may differ from actual frame.
6. Continue with the
Double Door Assembly
procedures.
Install profile here.