HITCHING YOUR AERVATOR TO A TRACTOR
1.
Set up the Aervator on level ground and stand on all 4 jack stands.
2.
Reverse the tractor up to the Aervator, with the lower link arms at the same height of
the pick up attach points on Aervator.
3.
Fit the right hand pin through the Aervator attach point first.
4.
Continue to attach the left hand side. You may need to use level box to lift or lower link
arm to match attach point.
3 sets of holes allow the correct position to get the lift arms to suit the working conditions.
5.
Connect the top link and adjust so machine is level.
Readjust if necessary when the machine is at working depth to keep frame level.
6.
Tighten side sway chains on lower links to centralize and hold implement firm.
7.
Lift Aervator off the ground with hydraulics.
Raise jack stands to top hole for transport and working, or remove altogether if so desired.
REGULAR MAINTENANCE
Bearings
•
Grease bearings sparingly so as not to expand the metal seals. One or two pumps every 10
working hours.
Gang bolts
•
Check regularly for tightness, particularly after changing settings.
Tine bolts
•
After inital working period of 2 - 5 hours, re-tighten all tine bolts.
Note: Use 3/4” or 19mm ring or socket spanner on bolt head to tighten NOT on the nut.
These are special flange nuts with a serrated grip to bite into the metal and stop nut
turning.
Содержание AerVator
Страница 10: ...1 10 11 12 2 9 8 7 6 3 4 5 ...
Страница 11: ...13 18 14 15 16 17 ...
Страница 14: ......
Страница 15: ...30 MOLONEY DRIVE WODONGA VICTORIA 3690 ...