JL 450
23
12
6
8
12
6
12
6
8
a)
b)
c)
ASSEMBLY OF THE MECHANISM
Make sure that the both pressure bearings are
installed in a correct position, that is, the bearing
with bigger internal diameter should be facing
WKHFDEOHGUXP¿JXUH0DNHVXUHWKDWWKH
position of the two clutch engagement halves is
FRUUHFW¿J
Place one of the clutch engagement halves
on the working tble so that the handle is at 8
o’clock position and the 3 slanted surfaces
face up.
Grease the 3 slanted surfaces with vaseline
and place the 3 rollers on the bottom of the
slanted surfaces so that the thin ends point
towards the middle. The other clutch enga-
gement half (without handle) has 3 slanted
surfaces on one side and two holes drilled on
WKHRWKHUVLGH¿J7ZRVWXGVRQWKHEDFN
RIWKHIURQWSODWHZLOO¿WLQWRWKHVHKROHVODWHU
on when the winch is assembled.
Place one clutch engagement half (without the
handle) so that the halves bottom out when
the handle is at 8 o’clock position and the two
KROHVDUHDWR¶FORFNDQGR¶FORFN¿J
Be careful, there is only one correct position!
Tape the halves together so that htey will stay
together when you mount them on the drum
axle.
1.
2.
3.
Install a protective plate. Check the clutch
adjustment.
4.
)LJ&RUUHFWSRVLWLRQLQJRIWKHWKUXVWEHDULQJV
Race with smaller inside diameter
Race with larger inside diameter
Wire drum
Drum axle
The race with the larger inside
diameter is towards the drum
The race with the larger inside
diameter is towards the drum
Roller
Clutch engagement half
Clutch engagement half
Front plate
Main sprocket
)LJ5HDVVHPEOLQJRIWKHFOXWFKHQJDJHPHQW
halves
Содержание JL 450
Страница 2: ......
Страница 25: ...JL 450 25...
Страница 34: ...JL 450 34 LL ASV TP14IH NK45 SV PLL NK1 W2200 HOF 4 ATP JK LK ACCESSORIES...
Страница 36: ...JL 450 36...
Страница 39: ......