21
CR67
TEST RUN
The crane operator must know the functions of the crane.
Read the instruction manual before making a test run.
1. Ensure that there are no personnel or obstacles in the
operating area. The danger area radius is 20 m.
2.
The test run ground must be level and firm.
3. Ensure that the control valve levers are in their cent-
re positions (neutral).
4.
Connect the flow to the crane. Let the oil circulate
through the valve for a few minutes.
5.
Lower the support legs.
6. Test the crane movements one cylinder at a time,
running them carefully to their full extensions and
back again until the movements are smooth.
7. Check and, if necessary, repair any leaking couplings
after the test run.
8.
Check and, if necessary, tighten the mounting screws
on the crane and support leg frame.
9.
Check the hydraulic oil level and, if necessary, refill.
Even though the crane is factory-
tested, there may still be air in the
cylinders. The cylinders must be bled
carefully. If a cylinder is run quickly
out to its full extension, the air pres-
sure inside the cylinder will damage
the gaskets.
WARNING
Содержание CR67
Страница 2: ...2 CR67 ...
Страница 29: ...29 CR67 A H F E D G H C I C B B 6 C B B LUBRICATION POINTS ...
Страница 36: ...36 CR67 17 8 10 16 18 20 22 21 3 6 7 12 5 13 23 9 15 11 1 19 2 4 14 CR67 SLEWING AND COLUMN ...
Страница 46: ...46 ...
Страница 47: ......
Страница 48: ...Farmi Forest Ahmolantie 6 74510 IISALMI FINLAND 358 0 17 832 4400 info farmiforest fi ...