64
CH27 ACR & ACC
KNIFE MAINTENANCE
Remove bolt A and nut B. Open the upper housing toward the discharge pipe. Lock the knife disk during maintenance.
Turn the knife disk until the hole in the disk is aligned with locking pin D. Remove locking pin circlip C and push the
pin into the hole in the disk. Lock the pin with the circlip.
Remove knife bolts E (4 pcs), nuts F (4 pcs) and lock washers G (4 pcs). Remove knife H. Sharpen or replace the
knife. Mount the knife with bolts, lock washers and nuts. Sharpen knives in pairs to keep lengths the same and maintain
disk balance.
Содержание CH27 ACC
Страница 2: ......
Страница 17: ...17 CH27 ACR ACC DIMENSIONS CH27ACR CH27ACC TRANSPORT POSITION CH27ACC SL27 HK4670 ...
Страница 19: ...19 CH27 ACR ACC HEIGHT WITH THE CHIPPER 27 3 9 m 2422 1268 851 320 200002275 DISCHARGE PIPE HIGH ...
Страница 31: ...31 CH27 ACR ACC BC3000 CH27 1 2 3 ...
Страница 32: ...32 CH27 ACR ACC BC3000 CH27 4 5 6 ...
Страница 34: ...34 ...
Страница 46: ...46 CH27 ACR ACC MOUNTING THE OIL COOLER 7 Fasten the oil cooler to the hydraulic unit as shown in the Figure ...
Страница 74: ...74 CH27 ACR ACC 200003767 SMART FEED BASIC CABIN 1 CHIPPER CABIN 2 1 6 5 4 3 2 7 ...
Страница 97: ...97 ...
Страница 105: ...105 ...
Страница 108: ...108 CH27 ACR ACC 1 19 17 13 14 15 11 12 18 7 5 4 8 10 9 3 2 21 6 8 9 10 16 20 200002328 3PSL SUPPORT LEGS ...
Страница 117: ...117 ...
Страница 121: ...121 CH27 ACR ACC 200002373 CROSS BREAKER ACCESSORY ...
Страница 122: ...122 ...
Страница 128: ...Farmi Forest Ahmolantie 6 74510 IISALMI FINLAND 358 0 17 832 4400 info farmiforest fi ...