MACHINE MAINTENANCE AND REPAIRS
MAINTENANCE PLAN
Perform the planned maintenance according to the instructions:
Maintenance Task
Daily
(season)
Once a
week
Before
season
After
season
Time
interval
Bolt connections
Visual
inspection of bolt and hydraulic joints,
tighten any loose joints using a corresponding
torque (see the torque chart)
Towing lug
– check, tighten if
needed
M 16 — 10.9. – 300 Nm
M 20 — 10.9. – 560 Nm
Wheels – tighten all wheel nuts
•
First time: after 10 hours of operation
•
Wheel replacement : after 10 hours of
operation
M 18 x 1,5 – 300 Nm
M 20 x 1,5 – 400 Nm
M 22 x 1,5 – 500 Nm
Brake system
Brake line and hoses
– check the function,
tightness, mounting and clamping, or breaking
Brake components
– check the function,
tightness, mounting
Air nozzle
– drain using the draining valve
Draining valve
– check the function, clean and
replace sealing
Pipe filter
– clean
Brake/parking brake
– check the function,
escapement setting
25-45mm
Brake lining
– check the condition of the brake
lining, min. thickness of 3mm
Wheels/axle
Checking the tyre pressure
Transport axle DSK 6,5 – 8,5 PSW – 520/50R17
151D/148E, pressure 350 KPa
Tracing wheels DSK 6,5– 8,5 PSW – 10,0/75 –
15,3 14 PR, pressure 550 kPa
Transport axle bearings
– check and adjust
allowance if needed (in the workshop)
37
|
44
Содержание DISKOMAT 6,5 PSW
Страница 2: ...2 44 Prepared by Technical Department Farmet a s on 26 01 2022 changes reservedy ...
Страница 4: ...PREFACE 4 44 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE ...
Страница 6: ...PREFACE 6 44 ...
Страница 15: ...WORK SAFETY LABELS Fig 1 Location of safety labels on the machine 15 44 ...
Страница 44: ...SERVICING AND WARRANTY CONDITIONS 44 44 ...