
22
1. Refer to OPERATING CONTROLS for important informa-
tion concerning adjustments for gas pressures, thermostat
settings, top auger timer, meter rolls, and other control set-
tings. Ensure that Test Firing Procedure has been per-
formed as described in Section 4 of this manual.
2. Measure moisture content of the wet grain and determine
method of drying to be performed.
3. Refer to the DRYING TABLES ahead to determine the
approximate drying time required to provide the required
moisture reduction for the drying method and dryer model
to be used.
4. Refer to the
START-UP PROCEDURE
within this section.
Perform all procedures listed.
5. Using the recommended drying time, refer to appropriate
DRYING TABLES ahead for suggested dryer settings and
other information.
O P E R A T I N G I N S T R U C T I O N S
Содержание C-2120A
Страница 8: ...6 ...
Страница 18: ...16 ...
Страница 22: ...20 ...
Страница 34: ...32 ...
Страница 38: ...Fig 6 8 ASC control panel internal view 36 Fig 6 7 ASC control panel ...
Страница 39: ...37 Fig 6 9 C 2100A power panel typical 3 phase model shown ...
Страница 44: ...42 ...
Страница 53: ...51 Fig 8 1 C 2100A power circuit 220V 1 phase ...
Страница 54: ...52 Fig 8 2 C 2100A power circuit 220V 3 phase models ...
Страница 55: ...53 Fig 8 3 C 2100A power circuit 440V 3 phase models ...
Страница 56: ...54 Fig 8 4 C 2100A general control circuit p 1 of 3 ...
Страница 57: ...55 Fig 8 4 C 2100A general control circuit p 2 of 3 ...
Страница 58: ...56 Fig 8 4 C 2100A general control circuit p 3 of 3 ...
Страница 59: ...57 Fig 8 5 C 2100A burner control circuit circuit ...
Страница 60: ...58 ...
Страница 66: ...64 ...
Страница 67: ......
Страница 68: ...Division of ffi Corporation 5900 Elmwood Ave Indianapolis IN 46203 1998 ffi Corporation Printed in USA 5 14 98 ...