USE AND MAINTENANCE MANUAL - SECTION 6
AERIAL PLATFORM ELEVAH 65-80 ES MOVE
– Rev. 03_2019
Page 6-1
SECTION 6. DAILY INSPECTION
Start the full inspection from point (a), as set out in the following list. Proceed
around the machine checking all listed conditions in sequence.
ATTENTION
TO AVOID ANY INJURIES, ENSURE THAT THE MACHINE POWER SUPPLY IS
SWITCHED OFF DURING THE "FULL INSPECTION".
DO NOT USE THE MACHINE BEFORE REPAIRING ALL FAULTS.
DO NOT FAIL TO CARRY OUT A VISUAL INSPECTION OF THE LOWER PART
OF THE BASE FRAME. ENSURE THE AREA IS CLEAR OF OBJECTS OR
DEBRIS THAT MIGHT CAUSE SERIOUS DAMAGE TO THE MACHINE.
NOTE FOR INSPECTION: besides complying with the above criteria, ensure
for each component that all parts are present, securely fixed and not loose
and that there are no visible damage, leaks or signs of excessive wear.
a) Drive wheels/free wheels and swivel castors
Check there is no debris on the wheels or around them;
b) Base frame
Ensure there are no loose wires or cables hanging underneath the base,
check for any dents, breaks or cracks on the profiles;
c) Manual descent control valve
– See note pertaining to functional
check;
d) Outriggers (if present)
Check for dents on the aluminium profiles, breaks or cracks, and check
operation of the adjustable outrigger feet;
e) Motor/pump/tank unit
No conspicuous hydraulic leak, hydraulic oil filling level at the "full" line;
f) Batteries (if present)
If necessary, charge them;
Содержание ELEVAH 65 ES MOVE
Страница 73: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ELEVAH 65 80 ES MOVE Rev 03_2019 Page 9 3 1 1 11 3 5...
Страница 75: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ELEVAH 65 80 ES MOVE Rev 03_2019 Page 9 5 7 1 1 13 3...
Страница 76: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ELEVAH 65 80 ES MOVE Rev 03_2019 Page 9 6 1 1 8 13 6 7...
Страница 78: ...USE AND MAINTENANCE MANUAL SECTION 9 AERIAL PLATFORM ELEVAH 65 80 ES MOVE Rev 03_2019 Page 9 8...
Страница 82: ...NOTES...
Страница 83: ......