background image

5

off the control unit is working regularly, check then the 

servo control and the mixing valve.

Check for regular operation of couplers between ser-

vomotor and mixing valve control stem, and for ab-

sence of sliding caused by loosening of setscrews.

EXAMPLES  OF  ELECTRIC  CONNECTIONS  FOR 

MIXING VALVE WITH SERVO CONTROL AND FOR 

BURNERS

1  -  Wiring  diagram  for  motor-operated  mixing 

valves  with  servo  controls  powered  with  230  V 

50 Hz

Circulation pump supply

Servo control

Supply voltage 

Common
Open

Close

Delivery probe

EC12 - EC13

Outside 

probe 

EC11

230 V - 50 Hz

Circulation pump supply

Circulation pump supply

Servo control 

supply

Supply voltage 

Supply voltage 

Burner supply

Delivery probe 

EC12 - EC13

Delivery probe 

EC12 - EC13

Outside 

probe 

EC11

Outside 

probe 

EC11

230 V - 50 Hz

230 V - 50 Hz

Base with terminal board

2  -  Wiring  diagram  for  motor-operated  mixing 

valves with servo controls powered with voltages 

other than 230V 50 Hz

3 - Schema elettrico per il comando ON-OFF del 

bruciatore

Содержание EV02F

Страница 1: ...e set programming determines the delivery water temperature value to be sent to the system to keep the set ambient temperature constant The control unit is fitted with quartz clock for daily programmi...

Страница 2: ...in insulat ing material with transparent cover Protection IP40 installation wall flush or rear panel mounting TECHNICAL DATA Control unit consumption 5VA Supply voltage 230V 10 50Hz Compliance with CE...

Страница 3: ...re similar to those tabulated below Resistance values as a function of temperature EC11 OUTSIDE PROBE TEMPERATURE RESISTANCE C DELIVERY PROBES EC12 EC13 TEMPERATURE RESISTANCE C 40 8629 35 7853 30 711...

Страница 4: ...ff with the exception of the an tifreeze protection in the antifreeze operating mode and at night in the AUTOMATIC 2 operating mode To make the most of the remaining heat accumulated during the daytim...

Страница 5: ...ervo controls powered with 230 V 50 Hz Circulation pump supply Servo control Supply voltage Common Open Close Delivery probe EC12 EC13 Outside probe EC11 230 V 50 Hz Circulation pump supply Circulatio...

Страница 6: ...mfort Automatic 2 nightime antifreeze daytime comfort Screw for mechanical connection between electronic panel and terminal base Quartz clock for daily programming FRONT CONTROL PANEL L H G F E A A B...

Страница 7: ...the purpose and with heat conducting paste interposed in order to guarantee proper heat conduction The immersion probe EC13 must be fitted in the pip ing with the sheath filled with mineral oil or si...

Страница 8: ...8 EXAMPLES OF HYDRAULIC CONNECTIONS FOR MIXING VALVES 3 WAY SECTOR POWER OPERATED MIXING VALVE 3 WAY ROTOR POWER OPERATED MIXING VALVE 4 WAY ROTOR POWER OPERATED MIXING VALVE...

Страница 9: ...turn slightly knob F counterclockwise if it is higher turn knob F clockwise Check again temperature after 24 hours If required keep on adjusting knob F position like indicated in the table below unti...

Страница 10: ...NAL INSTRUCTIONS WINTER MODE DUTY Open the circulation pump gate valves Start the pump If the system is equipped with mixing valve operate the valve manually to remove any sediment deposi ted inside t...

Страница 11: ...etely then turn the system off b stop water circulation pump c close circulation pump gate valves to prevent hot water infiltration into radiator circuits during the sum mer since mixing valves do not...

Отзывы: