Air Quality Sensor – AQS 1(

Not compatible with ERV-WI 500)

The wall mount Air Quality Sensor (AQS) monitors
indoor air quality and activates the override mode when
cigarette smoke, formaldehyde, benzene, volatile
organic compounds and other pollutants are detected.
The unit will then return to normal mode once the air
pollutants are reduced to a pre-determined lower level.  
Three low voltage wires are required for operation

* This control is not a warning device.

Dehumidistat – MDEH 1

The wall mount dehumidistat monitors the humidity level

in the area it is installed. When the humidity level rises
above the desired set-point, the HRV will activate to high
speed/override mode. Once the humidity level returns to
desired condition, the unit will return to the normal mode.
Two (2) low voltage wires required for operation. 

Note the

dehumidistat helps dehumidify by increasing the speed of the
HRV/ERV. Dehumidification will only take place when the air outside is
dryer than the air inside.

OPTIONAL REMOTE CONTROLS

1. Continuous / Ventilation Mode 

In this mode of operation both fans are operating and exchanging air with the outside. The heat/energy recovery ven-
tilator (HRV/ERV) constantly exchanges the air at the rate you select, either at low or medium speed, and switches to
high speed when activated by an optional remote control. The "Low" and "Med" fan speed selection will cause the unit
to operate in continuous exchange mode at a reduce exchange rate. Continuous mode is recommended, since pollu-
tants are slowly but constantly being generated in a building. 

NOTE: Model ERV-WI 500 is a single speed unit only. Optional speed control is available.

2. Intermittent / Standby Mode

The system is always on standby and operates at high speed when activated by an optional remote control
(required): "Standby" should be selected if the user wishes to stop the unit from continuous exchange.

3. Defrost (Fan shutdown HRV-XI 450 & ERV-WI 500 only)

The automatic defrost cycle of HRV’s consists of a fan shut-
down. When the supply air stream temperature goes below
23°F (-5°C), the supply motor shuts down and the exhaust
motor goes in to high speed. Ambient air is passed through
the unit for a period of 5 minutes. The supply motor will then
re-start and run at the preset speed. The exhaust motor will
also slow down to the preset speed, and the unit will operate
in the run cycle for 25 minutes. This fan shutdown defrost
cycle continues until the supply air stream rises above 23°F
(-5°C).

MODES OF OPERATION

OPERATION

The HRV/ERV is shipped from the factory on low speed, intermittent operation can be obtain by toggle switch located
on outside of cabinet (HRV-XI 450 & ERV-XI 450) or by manipulating jumpers in the electrical box. See wiring diagram.
The ERV-WI 500 is factory set to high speed. Internal low voltage contacts allow interuption of power to unit when
optional remote control is used. See spec sheet for control options.

SETTING SPEED

HRV-XI 450

ERV-XI 450

Example

Dry Contacts

* HRV-XI 450 Shown

*

Содержание PLATINUM STAGE

Страница 1: ...anical equipment i e a forced air furnace or air handler oper ating at a higher static After installation the compatibility of the two pieces of equipment must be confirmed by measuring the airflow s...

Страница 2: ...r circumstances outside Fantech s control Inappropriate installation or maintenance may result in the cancellation of the warranty Any unauthorized work will result in the cancellation of the warranty...

Страница 3: ...mm depth Cores are manufactured using silicone to withstand extreme temperature variations Aluminum cores are optional FILTERS Four 4 Washable Electrostatic Panel Type Air Filters 11 75 298mm x 15 380...

Страница 4: ...58mm 1 9 47mm 22 0 556mm 8 0 202mm 8 0 202mm 0 0 2 0 4 0 6 0 8 1 1 2 1 4 1 6 1 8 2 0 50 100 150 200 250 300 350 400 450 500 0 0 49 8 99 5 149 3 199 0 248 8 298 6 348 3 398 1 447 8 497 6 0 35 71 106 14...

Страница 5: ...lectrically connected with a quick connect for fast and easy inspection of blowers CORES Two 2 modular enthalpic energy recovery cores configured for an efficient cross flow ventilation Each core is 1...

Страница 6: ...1 24 59 94 130 165 201 236 271 Airflow cfm Airflow L s Static Pressure in W C Static Pressure Pa Med High Contact Factory for wiring info Med High High Med Low 0 67 0 69 0 71 0 73 0 75 0 77 0 79 0 81...

Страница 7: ...and threaded rod not supplied or placed on a platform CONTROLS Low voltage 24VAC internal dry contacts to activate unit from off position to high speed see wiring diagram DEFROST A preset 5 minute def...

Страница 8: ...mm 14 355mm 8 203mm 17 67 449mm 5 90 149mm 54 30 1379mm 56 30 1429mm 50 23 1276mm 32 16 817mm 30 40 772mm 18 32 465 4mm 3 24 82mm High Speed Low Speed Airflow L s Airflow cfm Static Pressure Pa Static...

Страница 9: ...perate in continuous exchange mode at a reduce exchange rate Continuous mode is recommended since pollu tants are slowly but constantly being generated in a building NOTE Model ERV WI 500 is a single...

Страница 10: ...the freezing point A P trap should be made in the drain line This will prevent odors from being drawn back up into the unit The drain connection is a 1 2 NPT nipple MOUNTING LOCATION The HRV ERV must...

Страница 11: ...rimeter of the weatherhood must be sealed to prevent leakage into the building The design and size of the weatherhoods or louvers chosen by the installer must allow for adequate free area Water and sn...

Страница 12: ...ductwork Because an HRV ERV is designed to bring fresh air into the building structures may require supply voltage interrupt when smoke or flame sensors are triggered or when a central fire alarm syst...

Страница 13: ...ll 6 152 mm to 12 305 mm from the ceiling Push the Fantech grille MGE metal or PGE plastic into the optional mounting collar or directly into installed elbow INSTALLING DUCTS TO FROM INSIDE CON T PRAC...

Страница 14: ...of duct work number of fittings used in duct work duct heater etc Fully Dedicated System Stale air drawn from areas of contamination Fresh air supplied to main areas HRV ERV must be balanced External...

Страница 15: ...ittings used in duct work duct heater etc SUPPLY IN EXHAUST OUT HRV UNIT RETURN AIR DUCT AIR HANDLER UNIT SUPPLY IN BALANCING DAMPERS SUPPLY IN EXHAUST OUT HRV UNIT SUPPLY DUCT EXHAUST AIR TO HRV UNIT...

Страница 16: ...the other duct The flows should now be balanced Actual airflow can be determined from the gauge reading The value read on the gauge is called the velocity pressure The Pitot tube comes with a chart th...

Страница 17: ...core guide approximately 1 4 6mm followed by the other side c mount the top flange of the core guide into the top channel approximately 1 4 6mm d with all four corners in place and the core straight a...

Страница 18: ...B6 LIVE TB1 White White Red TB4 TB6 Red TB8 TB10 NO TB7 NC NO TB3 COM SUPPLY R2 COM DEFROST R3 NC NO COM R4 TB1 Defrost Timer 1 2 1 5 4 5 3 2 4 5 4 3 1 2 3 2 1 5 4 3 WIRING DIAGRAM ERV XI 450 120 VAC...

Страница 19: ...2 1 1 2 Brown OPTIONAL SPEED CONTROL Blue TB4 SUPPLY MOTOR TB2 TB4 Blue EXHAUST Brown MOTOR Black TB7 TB8 5 4 Black SPEED CONTROL TB10 TB9 OPTIONAL 5 4 WHEEL MOTOR 13 9 12 14 TB5 TB1 TB6 TB3 R1 3 R2...

Страница 20: ...Ontario Western Canada 10 6665 Tomken Road Mississauga Ontario Canada L5T 2C4 T 1 800 407 6195 F 1 800 407 8965 T 1 905 696 9235 F 1 905 696 9236 Qu bec Atlantic Provinces 50 Kanalflakt Way Bouctouch...