background image

 

 

 

 

 

 

Site Selection

 

 

The key 

ob

j

ect

iv

e of a s

it

e eva

lu

ation or study 

is 

to place 

the 

Fan Turbine 

so  energy 

generated 

from 

the 

wi

nd 

i

s max

imi

zed 

w

hile meeting 

the 

loca

zoning 

requirements. 

Key 

elements to focus on 

during the 

s

i

te eva

lu

at

i

on 

in

c

lud

e:

 

 

1.  H

igh 

average 

wi

nd 

speeds. 

T

he 

turbine 

del

i

vers 

i

ts best energy 

performance 

i

n areas 

of high 

wi

nd 

speeds. 

This 

can 

best be 

determ

i

ned 

by using 

s

i

mp

l

e anemometers at the 

i

nsta

ll

at

io

s

it

e

.

 

It 

i

s recommended that such 

wi

nd 

speed 

data 

i

recorded for 

as 

l

ong a 

period 

as 

possib

le

 

and even better 

if 

seve

r

a

seasons  are cons

id

ered

When th

is 

i

not possible

published 

wi

nd data 

can 

g

i

ve 

an est

im

ate 

for the 

ave

r

age 

lo

cal 

wi

nd speeds. Pub

li

shed 

wi

nd at

l

ases 

ma

conta

in 

very  useful 

comparative 

data for 

region 

or a spec

i

fic 

locat

ion. 

Ho

w

ever

be very 

carefu

w

hen 

relying on

l

y on this 

inform

at

i

on as such data 

quite 

often tends 

to be 

measu

r

ed at 

very high 

altitudes and may 

not be useful 

at 

l

o

w

er and 

more pract

ica

he

ight

s.

 

 

2. 

As 

genera

ru

l

i

i

s  best  to 

i

nstall 

the 

turbine 

at  the    h

igh

est 

permissible  position 

and  

far  

r

emoved  

i

n  

proximity  

to  

trees  

and   other   ad

j

acent  

bu

i

ld

i

ngs   or  

structu

r

es.

 

 

3. 

A

l

w

ays  take 

i

nto cons

i

derat

i

on 

a

l

poss

ibl

e safety 

consequences 

of the turb

in

i

nsta

ll

at

io

at the 

l

oca

s

it

e.

 

 
 
 
 

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
        

Figure 2.1: 

Wind 

M

ap 

for USA

 

Содержание WT6500

Страница 1: ...FanTurbine Thismanual isintended solely for usebya Licensed Contractor of Fan Turbine FAN TURBI NE 5KW...

Страница 2: ...resource the wind Please take a moment to complete and return to us the Warranty Registration Card which comes with the product Please note that the warranty depends on the proper installation of the...

Страница 3: ...ion and Storage 3 Preassembly 4 Turbine Brake 4 2 Specifications Technical Specifications 6 3 Turbine Installation Turbine Mounting Introduction 8 Site Selection 10 Assembly 11 Rectifier 15 Blades Ass...

Страница 4: ...TO EASE THE INSTALLATION Important Safety Instructions 1 This Owner s Manual contains important instructions for the Fan Turbine installation and maintenance 2 Readthe entire Owner s Manual prior to i...

Страница 5: ...m the installation and maintenance functions on this Fan Turbine 10 The installation directions include recommendations of a variety of options Installation must be approved and certified by your loca...

Страница 6: ...Introduction For Information On See Product Description Shipping Contents 2 2 Before Installing 3 Transportation and Storage 3 Preassembly 4 Turbine Brake 4...

Страница 7: ...rator Theplacement of the permanent magnets in the generator produces the needed high speed motionwithout the need of any gearing mechanism The elimination of gears in this wind turbine technology enh...

Страница 8: ......

Страница 9: ...n Turbine Customer Service if there is any doubt or concern regarding this electric generator or its installation Transportation and Storage Careshouldbetakenwhenhandlingthegeneratorassemblyasitisquit...

Страница 10: ...f t h e 3 w i r e s f r o m t h e g e n e r a t o r i s e n g a g e d a n d s h o u l d b e i m p l e m e n t e d d u r i n g s h i p p i n g a n d i n s t a l l a t i o n a n d a s s e m b l y o r du...

Страница 11: ...maintenance or installation is completed Failure to do so may result in injury and or property damage If any maintenance is to be done on the turbine the turbine must be put inBRAKEmode and the blades...

Страница 12: ...Specifications For Information On See Technical Specifications 7...

Страница 13: ...Depends on Inverter chosen Protection Brakes may be activated by connecting 2 wires Duty Type S1 Continuous Duty Cut InWindSpeed 1 mph 0 4 m s Rated Wind Speed 31 mph 13 9 m s Survival Wind Speed 140...

Страница 14: ...Turbine Installation For Information on See Introduction 9 Site Selection 10 Turbine Spacing 11 Mounting Options 12 Rectifier 15 Blades Assembly 16 Wiring 17 Grounding 17 Operation 18...

Страница 15: ...the Fan Turbine Authorized Installer or other licensed contractor must acquire all the necessary permits from the local authorities BEFORE installation PERSONAL INJURY AND PROPERTY DAMAGE HAZARD Do no...

Страница 16: ...seasons are considered When this is not possible published wind data can give an estimate for the average local wind speeds Published wind atlases may contain very useful comparative data for a regio...

Страница 17: ...ount of the generator assembly MOUNT 1 5 Outer Diameter Pole SLIP RING ROTATING BEARING BLADE INSTALLATION 1 Be sure that the generator brake is on by attaching any 2 of the wires to each other This p...

Страница 18: ...d NUTS 1 4 20 HEX BOLTS AND LOCK NUTS CAN ALSO BE USED WHILE ONE PERSON IS HOLDING THE BACK OF THE NUT WITH A WRENCH OR M6 CAPS NUT WRENCH M6 ALLEN WRENCH THE OTHER PERSON IS SECURING 6 HOLES WITH A P...

Страница 19: ...R THEN THE LOCK NUT ON THE OUTSIDE DO NOT OVERTIGHTEN THE LOCK NUTS WHICH COULD CRUSH THE CARBON BLADES SAFETY HOLD THIS INDICATES THE PROPER WAY TO GET CONTROL OF THE GENERATOR WHICH IS SPINNING APPR...

Страница 20: ...Rectifier 3 phase Bridge Rectifier will convert the three phase AC output from the generator to DC...

Страница 21: ...BLADE Assembly PROFESSIONAL INSTALLATION REQUIRED...

Страница 22: ...ix 6 nuts are fully tightened with plastic washer metal washer and lock nut Figure 2 9 Ensure the nuts are tight with plastic washers against the carbon Figure 2 11 Mount the blades with brake on by t...

Страница 23: ...ime 2 persons Figure2 10 Mount blades 2 persons one at a time with brake on Figure 2 12 Brake on Repeat steps for remaining blades Lock the assembly with 4 x M8 Bolts against the pole and lock in the...

Страница 24: ...f the Fan Turbine Grounding REVERSE POLARITY DAMAGE Before making the final DC connection or closing the DC breaker or disconnect check cable polarity at all connections Positive must be connected to...

Страница 25: ...LICENSED ELECTRICIAN MUST INSTALL AND COMMISSION THIS TURBINE USING YOUR NATIONAL ELECTRIC CODEAND IN COMPLIANCE TO THE LOCAL PERMITTING AND ZONING CODES Followthe electricalconnections andcommission...

Страница 26: ...Warranty Information...

Страница 27: ...date the defect is discovered Notice shall be in writing or by telephone Notices by telephone shall be made by calling Customer Service at 800 489 0908 and written notices shall be sent to Fan Turbin...

Страница 28: ...d delivery and installation of the replacement productwillbethe responsibility of the Purchaser Allreplacedpartsandproductsshallbecomethe propertyofFan Turbine onthe date the part or product isreplace...

Страница 29: ...BINE ICS EXPRESSLY DISCLAIMS AND EXCLUDES ALL OTHER EXPRESS WARRANTIES ADDITIONALLY TO THE EXTENT PERMITTED BY APPLICABLE LAW EACH AND EVERY IMPLIED WARRANTY THAT MAYAPPLY TO THE PRODUCT INCLUDING WIT...

Страница 30: ...roduct is purchased It is the Purchaser s responsibility to check the website to see if the warranty posted there is different than the warranty stated herein Governing Law If the Purchaser purchases...

Страница 31: ...lies Part Edition Date 1 0 2009 01 22 1 General Rules CENELEC EN61 000 6 2 Electromagnetic Compatibility EMC Part6 2 Generic 1 999 01 01 Standards Immunity for Industrial Environments CENELEC EN 61 00...

Страница 32: ...Fan Turbine Inc www FanTurbine com FanTurbine 5KW...

Отзывы: