
17
8.2.3.3.5 Drilling template for data cabling
In case of data cables (USB) should arrive at the rear casing, and extra drilling holes on the pole
could be considered.
8.2.3.4 Mechanical assembly & electrical installation
Warning: For safety reasons, make sure that the power supply is turned off throughout the
operation.
8.2.3.4.1 Preparation for assembly
The back casing of the Validator consists of:
● A back casing part
● An intermediate part, housing the power supply board
● Two sets of fixing brackets
● Three seals, each one composed of two halves
Содержание FX915SC-ASK
Страница 1: ...User Manual FX915SC ASK NFC Android Validator ...
Страница 3: ...2 13 2 NFC module information 37 ...
Страница 39: ...www famoco com April 2021 ...