Operation Manual
‘’
15
3.3 Layout on control panel
:
Control panel
:
Step 1
:
Connecting
.
Step 2
:
Connecting
Low voltage exit
Link wire “Link2” exit
High voltage exit
Link wire “Link 1” exit
Power cord exit
Low voltage wires
go through this
hole.
High voltage wires go
through this hole.
link1
link2
Power cord exit.
Connect the wires to the
PBC as per the numbers
marked on the PBC.
Содержание Half Court Hoops
Страница 1: ......
Страница 9: ...Operation Manual 8 Open the front bracket Step 2 ...
Страница 12: ...Operation Manual 11 Install ball gate assembly Install playfield Step 5 ...
Страница 13: ...Operation Manual 12 Install header assembly Step 6 ...
Страница 14: ...Operation Manual 13 Step 7 Install front panel Fix control panel Step 7 ...
Страница 15: ...Operation Manual 14 Fix side bracket Step 8 ...
Страница 34: ...Operation Manual 33 11 Overall structure 11 1 Main part 1 ...
Страница 36: ...Operation Manual 35 11 2 Main part 2 ...
Страница 38: ...Operation Manual 37 11 3 Motion Assy ...
Страница 40: ...Operation Manual 39 11 4 Ball gate Assy ...
Страница 43: ...Operation Manual 42 11 6 Other electroinc component ...
Страница 45: ...Operation Manual 44 11 7 Game decal 8 10 5 6 7 12 20 21 22 23 11 24 16 18 9 1 3 4 2 ...
Страница 46: ...Operation Manual 45 13 14 19 26 15 27 17 25 ...