Operation Manual
‘’
31
9. Game installation and service
9.1 Installation
○
1
Firstly check the assembling instructions and assemble the game.
○
2
Secondly, adjust the leveler of the game on even ground.
○
3
After installation, plug in. check the game operation. If there is a problem,
stop the game and please check the trouble shooting section of this manual.
9.2
Game maintenance
○
1
Try to run the game first before operation every day .
○
2
Check every component after running the game for a month.
○
3
Check the machine regularly.
Содержание Half Court Hoops
Страница 1: ......
Страница 9: ...Operation Manual 8 Open the front bracket Step 2 ...
Страница 12: ...Operation Manual 11 Install ball gate assembly Install playfield Step 5 ...
Страница 13: ...Operation Manual 12 Install header assembly Step 6 ...
Страница 14: ...Operation Manual 13 Step 7 Install front panel Fix control panel Step 7 ...
Страница 15: ...Operation Manual 14 Fix side bracket Step 8 ...
Страница 34: ...Operation Manual 33 11 Overall structure 11 1 Main part 1 ...
Страница 36: ...Operation Manual 35 11 2 Main part 2 ...
Страница 38: ...Operation Manual 37 11 3 Motion Assy ...
Страница 40: ...Operation Manual 39 11 4 Ball gate Assy ...
Страница 43: ...Operation Manual 42 11 6 Other electroinc component ...
Страница 45: ...Operation Manual 44 11 7 Game decal 8 10 5 6 7 12 20 21 22 23 11 24 16 18 9 1 3 4 2 ...
Страница 46: ...Operation Manual 45 13 14 19 26 15 27 17 25 ...