4.3 Cable Routing
4.3.1
Install the Winch or SRL-R as described in Section 4.2. Pay out approximately 6 ft. of cable. Maintain tension on the cable and place
the cable into the slot and under the Center Guide Pulley (1). Rotate the Head Assembly (2) to align the slots and place the cable over the
Head Pulley (3). Remove and reinstall the detent pin to capture the cable between the detent pin and pulley, see Figure 13.
Figure 13 - Cable Routing
1
2
3
4.4 Anchor Point Installation
4.4.1
Connect the U-Shaped Hanger Bracket to an anchor point, see Section 2.3, with certified hardware, such as a properly rated
carabiner, see Figure 14. Adjust the Lower Leg in a vertical position to support the weight of the Pole Hoist and Winch/SRL-R assembly.
Figure 14 - Anchor Point Installation
011819
MCS41 Rev A
7